Part V - Quality Assurance Project Plan
133-135 Greenwich Streel/21-23 Thames Street
Airtek Project 05-0701 - Rev 1 - January 27, 2006
PAHs/GC/MS Check connections.
Replace disposables.
Perform injection port maintenance.
Clip column.
Perform leak checks.
Clean detector.
Pesticides, Herbicide, &PCBs/GC/ECD Check connections.
Replace disposables.
Perform injection port maintenance.
Clip Column,.
Perform leak checks.
Clean detector.
Dioxins & Furans/HRGC/HRMS Check connections.
Check connections.
Replace disposables.
Perform injection port maintenance.
Clip Column,.
Perform leak checks.
Clean detector.____________________________________
Asbestos/TEM Align and check TEM scope. Calibrate for Al/Cu EDX
response daily._____________________________________
Silica/XRD Check daily or Si-primary peak, displacement, and detecto
resolution.________________________________________
Mercury/CVAES Check fitting, rinse and refill DDIW bottle, prepare new
pretraps, blank each analytical trap.
Soak bubblers in 1% KOH solution.
Change traps, replace lamps, clean/charge quartz cell.
Inspect tubing, replace fittings, prep new stock standards.
Mercuiy/CVAA Check fitting, rinse and refill DDIW bottle, prepare new
pretraps, blank each analytical trap.
Soak bubblers in 1% KOH solution.
Change traps, replace lamps, clean/charge quartz cell.
Inspect tubing, replace fittings, prep new stock standards.
Corrosivity/pH meter Condition probe when fluctuations occur.______________
PM 10 Annual calibration of balance by outside certification.(^)
Annual calibration records will be maintained by the Quality Assurance Officer.