NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 110 pages

Chain-of-custody for NY asbestos regulation, Part 56

Machine-extracted title · confidence 52%

Page 1 of a chain-of-custody form referencing NY CRR Part 56 and the NYC WTC records.

NYC-WTC_000438568–000438677
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

(3) Suspended Ceilings. Suspended ceiling tiles and T-grid components in proximity to friable ACM shall remain in place until the regulated abatement work area has been fully prepared in accordance with this Section, and electrical and HVAC systems have been shut down. These potentially contaminated suspended ceiling components shall be removed at the completion of the remaining work area preparation, including establishment of negative air ventilation systems, prior to commencement of Phase II B activities. These removed ceiling components shall be bagged/containerized and disposed of as asbestos waste. (4) Elevators. Elevators running through the regulated abatement work area shall conform to the following: (i) The elevator door in the regulated abatement work area shall be enclosed per Section 56-7.11 (d). (ii) Elevators not remaining in use shall have the fuses removed and the power switch locked in the open position. (iii) Elevator shafts shall not be used as waste chutes for asbestos waste material. (iv) Elevators that remain in use shall conform to the additional procedures to minimize the piston effects. (a) Elevator controls shall be modified to bypass the regulated abatement work area. (b) A third (final) layer of polyethylene is to be duct taped airtight but with slack so as to form a larger perimeter diaphragm. Air leakage across the barrier shall be corrected upon discovery, and the elevator shaft shall be checked for airborne asbestos contamination. If contamination is found in this area, the entire affected area shall be wet-cleaned prior to continuing any other work. (c) This system shall be smoke tested daily. (c) Removal. Removal of ACM, PACM and asbestos material shall proceed as per the requirements of Subpart 56-8. (d) Final Cleaning and Clearance Procedures. Final clean-up and clearance procedures for pre-demolition abatement shall comply with Section 56-9, except that only two stages of cleaning (first and final) are to performed. Lockdown encapsulant use shall be consistent with Section 9.1 (b). (e) Final Waste Removal From the Site. The requirements of Subpart 56-10 shall apply, once all asbestos project regulated abatement work areas have been completed. 56-11.5 Demolition with Asbestos in Place.

(a) Air Sampling and Analysis. Air sampling and analysis on an asbestos project

12 NYCRR56 Subpart 11, Page 101

CITY_21MC100_003246593

NYC-WTC_000438668

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000438668Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Compare copies and versions →