NYC 9/11 Public Portal Document
TRC
Customer-Focused Solutions
Corrective Action:
As a result of the roof abatement completion, samples were not collected on September 29, 2005
at air monitoring Stations 6, 7, 8, or 9. However, per ICR 56, the roof area was re-cleaned
utilizing additional supplemental wet-methods and asbestos air monitoring reinstated on the roof
for September 30, 2005 in order to confirm that concentrations were below the USEPA Site-
Specific Trigger Level for Asbestos. Eive samples were collected, one on each roof corner and
one in the roof center and analyzed for TEM EPA 40 CFR Part 763. No asbestos was detected in
the five samples (< 15 s/rnm’). These results are attached in the Supporting Data. Going
forward, TRC will continue to closely monitor the use of dust control practices including
frequently wetting surfaces containing dust with amended water during the work.
Supporting Data attached:
1. Analytical Data summary -analytical results for all stations on the date of the exceedance
and the additional sampling which occurred on September 30, 2005.
2. Particulate Data -
a. PM2.5 and PMw data for the sample collection period of interest at the station
where the exceedance occurred
b. plot of PMio concentrations (1 O-minute averages) versus time for the station
where the exceedance occurred.
3. Meteorological Data - wind rose plot for the sample collection period of interest
4. Visual Inspection Reports - visible dust emission monitoring summaries from the 130
Liberty Street project.
5. Photographs of activities at and near the station where the exceedance occurred
Submitted By: Ed Gerdts Date: October 3. 2005
CITY_21MC100_0 07123559
NYC-WTC_000438024
OCR can misread numbers and units. Confirm readings against the page image before using them.