Page image not rendered yet. The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
EM 1110-2-3800
1 Mar 72
Title Fig. No.
Relation of presplit to main pattern-------------------------- 5-20 5-20
Use of guide holes in presplitting inside and out
side corners --------------------------------------------------------------- 5-21 5-21
Typical arj-angement of line drilling with respect
to main blastholes------------------------------------------------------ 5-22 5-22
Main charge delays-------------------------------------------------------- 5-23 5-24
Plan of blasthole pattern for fragmentation of
rock to produce aggregate ---------------------- 5-24 5-25
Typical impedance calculation for granite---------------- 6-1 6-2
Empirical relation: blasthole spacing and
diameter and powder factor for multiple-row
blast pattern in rocks of different strengths----------- 6-2 6-5
Sonic log travel time as a function of porosity for
a suite of volcanic sedimentary rocks -and lava----- 6-3 6-6
Adverse dip of joints into excavation------------------------ 6-4 6-10
Variation of shear strength with inclination to
schistosity (y-z plane) in fine-grained gneiss------- 6-5 6-11
Effect of dipping strata on stability of excavation -- 6-6 6-14
Propagation laws for airblast pressure from
spherical charges for various scaled depths of
burial and from quarry blasting rounds------------------ 7-1 7-3
Summary of damage criterion data for frame
structure ---------------------------------------------------------------------- 7-2 7-6
Summary of nondamaging data above recommended
safe vibration level for frame structures-------------- 7-3 7-7
Subjective response of the human body to
vibratory motion---------------------------------------------------------- 7-4 7-9
Particle-velocity data versus distance for one
site------------------------------------------------------------------------------- 7-5 7-14
Maximum observed ranges of natural missiles
for buried explosions in basalt-------------------------------- 7-6 7-18
Example o£ one form of blasting log kept by
contractor -------------------------------------------------------------------- 8-1 8-5
Record of blasting required by one CE District------- 8-2 8-6
vii
CITY_21MC100_012669622
NYC-WTC_000435852
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000435852Source: NYC Law Department, mirrored locally