NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center, Feb 2002

Machine-extracted title · confidence 28%

Night shift workforce and equipment for World Trade Center, Feb 2002.

NYC-WTC_000432605
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SiRACE CON’RAC^IYG CORP. Bl-4S6lh Road, WWIestona, N Y. 11357-(718) 767-9000 DATE: 2/20/02 NIGHT FINAL

DAILY WORK FORCE REPORT I [Job Name & Location; World Trade Center .CoiLruc: Ko. [weather Conditions

Labor JI Equipment CLASSIFICATION QUANT. l[______ Description_____ MANNED STANDBY IDLE SUPERINTENDENT 1 1 GAT gee loader FOREMEN 2 1 CAT 365 GRAPPLER PROJECT ENGINEER 1 IICAT 375 GRAPPLER SAFETY ENGINEER 'Boat 375 bucket 1 LABORERS 16 IhITACHI 750 GRAPPLER ~ 7 IRON WORKERS [HITACH11200 GRAPPLER" 1 Local14 2 jjgSCFM COMPRESSOR RUNNING UNMANNED LOCAL 15 3 [ 236 HAMMER HOE RAM 1 CARPENTER IMECHANICS TRUCK 1 1 CARPENTER FOREMAN ITOOL TRUCK TEAMSTERS (FUEL) 1 [TOOL VAN |MECF. ANICS__________ 2 llROLL OFF HOUSE WRECKERS I DUMP TRAILERS [LOW BED TRWLER ‘ HIGH DECK TRAILERS ‘ WELDING TRUCK________ ’ELtVERIES; ■ FUEL TRUCK 1 ■ PICKUP-TRUCKS 3 ’light TOWERS 5 ■ SITE MULE_____________ 2 [TRUCK 74 DOWN AT 3:45 AM. DRIVER CHANGED ■ DUMP TRUCKS TO TRUCK 76 FOR DURATION OF NIGHT ■ 10 WHEEL DUMP TRUCK ’ FLASHING ARROW BOARD 1 ■ OFFICE TRAILER/GENER. 1 ■ CARGO BOXES 4 ■ FLAT TRUCK 1 ■pUMP 2

Descriplion of Work:______________________________________________________ FINAL WORK:_______________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF WTC COMPLEX MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA CONTINUE LOGGING TRUCKS AND NUMBER OF LOADS OUT OF SITE___________ NORMAL DELAYS DUE TO FDNY SIFTING OF MATERIAL ____________ TRUCKS DELAYED FROM 12:00-1:15 DUE TO VEHICLE WASH STATION SHUT DOWN FOR CLEANING OF GRATES___________________________________________ __ LOADS OUT. 53

GRACE CONTRACTING CORP L lApproved By: 04,028600 tTitle: SUPERINTENPEWT

DAILY WORK FORCE REPORT0220N.xls

CITY_21MC100_004198470

NYC-WTC_000432605

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000432605Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →