NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade, Feb 2002

Machine-extracted title · confidence 42%

Night final daily workforce and equipment for World Trade Center, Feb 20, 2002.

NYC-WTC_000291338
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. :;i-45C‘hRcsi. W.Wosto.ne, N.Y 11357-(718) 767-5000 DATE: 2/20/02 NIGHT FINAL

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center

Weather Conditions j Labor ________ Equipment CLASSIFICATION QUANT. Description 'MANNED STANDBY idle: SUPERINTENDENT 1 CAT 966 LOADER FOREMEN 2 CAT 365 GRAPPLER PROJECT ENGINEER 1 CAT 375 GRAPPLER SAFETY ENGINEER CAT 375 BUCKET 1 i LABORERS 16 HITACHI 750 GRAPPLER 1 I IRON WORKERS HITACH11200 GRAPPLER 1 jLOCAL 14 2 185 CFM COMPRESSOR RUNNING UNMANNED LOCAL 15 3 235 HAMMER HOE RAM 1 CARPENTER MECHANICS TRUCK 1 1 CARPENTER FOREMAN TOOL TRUCK TEAMSTERS (FUEL) 1 TOOL VAN [MECHANICS 2 ROLL OFF iHOUSE WRECKERS DUMP TRAILERS LOW BED TRAILER HIGH DECK TRAILERS WELDING TRUCK DELIVERIES: FUEL TRUCK 1 PICKUP.'TRUCKS 3 LIGHT TOWERS 5 SITE MULE 2 ■TRUCK 74 DOWN AT 3:45 AM. DRIVER CHANGED DUMP TRUCKS ■ TO TRUCK 76 FOR DURATION OF NIGHT 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD i 1 OFFICE TRAILER/-GENER. 1 CARGO BOXES 4 FLAT TRUCK i 1 PUMP 2

I I

i Descriaiion of Work:__________________________________________________________ : FINAL WORK-______________________________________________________________ •'CONTINUE REMOVING DESRIS FROM LOWER LEVELS OF'ATC COMPLEX________ •'maintain TRAFFIC FLOW INTO AND OUT OF AREA_____________________________ ■CONTINUE LOGGING TRUCKS AND NUMBER OF LOADS OU'" OF SITE__________ 2. !NORMAL DELAYS DUE TO FPNV SIFTING OF MATERIAL_________________________ :TRUCKS DELAYED FROM 12:00-1:15 DUE TO VEHICLE WASH STATION SHUT DOWN iFOR CLEANING OF GRATES_________________________________________________ (LOADS OUTTSS

GRACE CONTRACTING CORP j. iAparoved By: BY: jTiilo: (Far; SUPERINTEMOEHT 1 I

DAIL':' WCRK FORCE RE=ORT022:N,xIs

CITY_21MC100_004774806

NYC-WTC_000291338

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291338Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →