GRACE CONTRACTING CORP. 151-45 6lh Road. Whitestone. M.V. 11357.(718)757-9000 DATE: 2/12'02 DAY FINAL
DAILY WORK FORCE REPORT
Job Name 8. Location; World Trade Center Contract No. Weather Conditions
I ■ Labor "1 = ,.- '-----------------
CLASSIFICATION 1 QUANT. 11 Equipment Description MANNED STANDBY IDLE [superintendent 2 ' CAT 966 LOADER 1 FOREMEN 1 ' CAT 365 GRAPPLER 1 PROJECT ENGINEER 2 ■ CAT 375 BUCKET 1 SAFETY OFFICER 1 flCAT 375 GRAPPLER" 1 LABORERS__________ 14 [ HITACHI 750 GRAPPLER ~ 1 IRON WORKERS IIhITACHI 1200 GRAPPLER" 1 LOCAL 14 4 [185 CFM COMPRESSOR •SEE NOTE (local 15 5 ■ 235 HAMMER HOE RAM 1 [carpenter ■ MECHANICS TRUCK 2 CARPENTER FOREMAN 1 ■ TOOL TRUCK TEAMSTERS (FUEL") 1 ' tool VAN mechanics 2 ' ROLL OFF (house WRECKERS Idumpti^ilers 1 LOW BED TRAILER I IHIGH DECK TRAILERS 1 WELDING TRUCK 1 DELIVERIES: flFUELTRUCK 1 PICKUP TRUCKS 6 MOTE: 185 CFH COMPRESSOR RUNNING UNMANNED LIGHT TOWERS 5 SITE MULE 2 |14 TEAMSTERS (10 DUMP TRAILERS, 4 EUKES ) pUMP TRUCKS JlOWHlaOTP^C^ I^NOTE: TRUCK 83 WAS BEING FILLED WITH DIRT FROM THE ^FLASHING ARROW BOARD TRENCH WORK AT LIBERTY & WEST. WILL NOT DO AS [foFFiCE trailer;gener.~ 1 MANY LOADS AS THE OTHER TRUCKS CARGO BOXES 4 FLAT TRUCK DELAYS: TRUCK 99 WAS DOWN FROM 10:00 AM TO 12:00 PM PUMP 2 WITH AIR TANK PROBLEM, & TRUCK 67 WAS DOWN FROM 11:00 TO 12:30 PM WITH NO HEADLIGHTS & A FLAT TIRE
Description of Work;
CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF WTC COMPLEX MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA___________________ CONTINUE LOGGING TRUCKS AND NUMBER OF LOADS OUT OF SITE LOADS OUT: 77
GRACE CONTRACTING CORP Approved By; BY; Z Title: ---- i/t I’. For: SUPERINTENDENT T
04.028583 DAILY WORK FORCE REPORT02i2D.xls
CITY_21MC100_004198453
NYC-WTC_000432600
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000389563
Day final daily workforce and equipment listing for World Trade site, Feb 2002.
1 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305134
Day shift daily workforce and equipment at World Trade site, Feb 12, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280855
Day final daily workforce report for Grace Contracting at World Trade Center, Feb 2002.
1 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429469
Day shift workforce and equipment at World Trade Center project.
1 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000360485
Daily workforce roster listing personnel and equipment at site.
1 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000268616
Daily workforce and equipment roster with labor and equipment details for World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237703
Day shift final daily work force and equipment log for Grace Contracting Corp. at the World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291353
Day shift workforce and equipment at World Trade Center, Feb 12, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291354
Night shift workforce and equipment for World Trade Center, Dec 13-15 2001.
1 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291351
Day shift workforce and equipment at World Trade Center, Feb 11, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356485
Night final daily workforce report for World Trade Center construction.
1 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000360491
Night shift daily workforce with equipment details.
1 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000389563
Day final daily workforce and equipment listing for World Trade site, Feb 2002.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305134
Day shift daily workforce and equipment at World Trade site, Feb 12, 2002.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280855
Day final daily workforce report for Grace Contracting at World Trade Center, Feb 2002.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429469
Day shift workforce and equipment at World Trade Center project.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000360485
Daily workforce roster listing personnel and equipment at site.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000268616
Daily workforce and equipment roster with labor and equipment details for World Trade Center site.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000389563
Day final daily workforce and equipment listing for World Trade site, Feb 2002.
Similar indexed content
NYC-WTC_000305134
Day shift daily workforce and equipment at World Trade site, Feb 12, 2002.
Similar indexed content
NYC-WTC_000280855
Day final daily workforce report for Grace Contracting at World Trade Center, Feb 2002.
Similar indexed content
NYC-WTC_000429469
Day shift workforce and equipment at World Trade Center project.
Similar indexed content
NYC-WTC_000360485
Daily workforce roster listing personnel and equipment at site.
Similar indexed content