NYC-WTC_000419297
Night final daily workforce report noting conditions and equipment at World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗Night final workforce and equipment at World Trade Center, Jan 15, 2002.
NYC-WTC_000432565OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. lS|.456mBeBll, WlIlaetOKB. N.Y. 757.9(100 DATE; V15/02 NIGHT FINAL
DAJLV ^ob Name & Location: World Trade WORK FORCE REPORT Center
Contract No, Waaih^f CondiVons: UNSEASONABLY MILD, YET BLUSTERY (38 mph WIND) A COLD. MOSTLY DARK.
Labar Equipment CLASSIFICATION QUANT. Description SUPERINTENDENT 2 CAT 969 LOADER 1 PROJECT ENGINEER 1 CAT448 BACKHOE OFFICE ENGINEER ■ CAT 973 LOADER 1 FOREMEN 2 ■ CAT 365 GRAPPLER 1 SAFETY OFFICER ■ CAT 37S GRAPPLER 1 LABORERS 9 ■ CAT 375 BUCKET 1 IRON WORKERS ■ HITACHI 750 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER LOCAL 15 7 HITACH11200 GRAPPLER 1 carpenter 185 CFM COMPRESSOR • 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS (FUEL)__________________ 1 MECHANICS TRUCK 1 1 mechanics 1 TOOL TRUCK HOUSE WRECKERS 3 TOOL VAN TEAMSTERS (STEEL ANO DEBRIS: EUKES) 14 ■ ROLL OFF DUMP TRAILERS_______ _ ■ LOW BED TRAILER DEUVERieS; HIGH DECK TRAILERS 1 wsloing truck ~ FUELTRUCK___________ 1 PICKUP TRUCKS 3 light TOWERS 5 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 DELAYS: LOST 3,5 HOURS DUE TO FONY ACTIVITY OFFICE TRAILERTGENER, 1 IN THE HOLE. GRAPPLES DID NOT LOAD IN THE CARGO BOXES 3 Pole; FLAT TRUCK I ’UMP 2 RAINMAKER/GENIE LIFT 1
Description o( Work: CQMPLET£D WORK _______ _________________________________________ CONTINUED REMOVING DEBRIS FROM LOWER LEVELS______________________________ MANNED WATERING STATIONS FOR DUST CONTROL________________________________ MAINTAINED TRAFFIC INTO ANO OUT OF AREA_____________________________________ APPROXIMATELY 3.5 HOUR DELAY DUE TO FONY ACTIVITY RELATED TO FIRE IN THE HOLE. LOADS OUT: 83 ~ EUKES OUT; 138
GRACE CONTRACTING CORP Approved By: BY; ■nfls: Fof; SUPERINTCNOeMT
04.028534 DAILY WORK FORCE R"PORTO 1 ISN.xJa
CITY_21MC100_004198405
NYC-WTC_000432565
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000419297
Night final daily workforce report noting conditions and equipment at World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237655
Grace Contracting Corp. daily log of laborers and equipment at the World Trade site for January 15, 2002 night shift.
2 shared non-person entities · 1 shared topics · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263618
Daily workforce and weather note for World Trade Center site, Jan 2002.
2 shared non-person entities · 1 shared topics · similarity 0.954
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342297
Daily workforce allocation and equipment list for World Trade Center site, Jan 15, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322605
Day final workforce and equipment listing for World Trade site, Feb 1, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388260
Day shift daily workforce for World Trade Center site, November 26, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305158
Night shift daily workforce report with weather notes for World Trade site, January 2002.
2 shared non-person entities · 1 shared topics · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356547
Night final daily workforce and weather notes for World Trade site, Jan 15, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000407316
Night shift daily workforce report for World Trade Center project; lists crew and equipment.
1 shared non-person entities · 1 shared topics · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280853
Night final daily workforce log for World Trade Center, Feb 2002.
1 shared non-person entities · 1 shared topics · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305478
Day preliminary daily workforce and equipment at World Trade Center site, jan 29 2002.
1 shared non-person entities · 1 shared topics · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000341039
Night shift labor and equipment roster for World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000419297
Night final daily workforce report noting conditions and equipment at World Trade Center site.
Similarity score 0.983 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237655
Grace Contracting Corp. daily log of laborers and equipment at the World Trade site for January 15, 2002 night shift.
Similarity score 0.978 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263618
Daily workforce and weather note for World Trade Center site, Jan 2002.
Similarity score 0.977 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342297
Daily workforce allocation and equipment list for World Trade Center site, Jan 15, 2002.
Similarity score 0.977 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322605
Day final workforce and equipment listing for World Trade site, Feb 1, 2002.
Similarity score 0.976 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388260
Day shift daily workforce for World Trade Center site, November 26, 2001.
Similarity score 0.976 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000419297
Night final daily workforce report noting conditions and equipment at World Trade Center site.
Similar indexed content
NYC-WTC_000237655
Grace Contracting Corp. daily log of laborers and equipment at the World Trade site for January 15, 2002 night shift.
Similar indexed content
NYC-WTC_000263618
Daily workforce and weather note for World Trade Center site, Jan 2002.
Similar indexed content
NYC-WTC_000342297
Daily workforce allocation and equipment list for World Trade Center site, Jan 15, 2002.
Similar indexed content
NYC-WTC_000322605
Day final workforce and equipment listing for World Trade site, Feb 1, 2002.
Similar indexed content