Page image not rendered yet. The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE COI RACTING CORP.
151-45 6th Road. WhI lone. M Y 11357.(718)767-9000 DATE: JA NUARY 4. 2002 NIGHT [FINAL]
DAILY WORK FORCE REPORT
iJob Name & Loc ion: World Trade Center
lontract No.
'eather Con dil ns; Clear and cold
Labor Equipment
CLASSIFICATION QUANT, Description MANNED STANDBYl IDLE
i 2 ;AT 966 LOADER 1
[PROJECT ENGII«ER [CAT 446 BACKHOE 1
[office ENGINSy ;AT 973 LOADER 1
FOREMEN 1 2 :AT 365 GRAPPLER 1
:AT 375 GRAPPLER 1
LABORERS ■ 20 :AT 375 GRAPPLER 1
[HITACHI 750 GRAPPLER 7
LOCAL 14 5 HITACHI 550 BUCKET 1
LOCAL IS
CARPENTER
S HITACH11200 GRAPPLER
1
I
185 CFM COMPRESSOR i
EMAN 235 HAMMER HOE RAM 1
[(TEAMSTERS 1 MECHANICS TRUCK 1
MECHANICS 2 TOOL TRUCK
HOUSE WRECK IS 7 ] TOOL VAN 1
■ ROLL OFF
■ DUMP TRAILERS
■ LOW BED TRAILER
IDELIVERIES: ■ HIGH DECK TRAILERS
1 WELDING TRUCK 1
TIfUEL TRUCK 1
nPICKUP TRUCKS 1
[LIGHT TOWERS 13
DELAYS: T-74D WN AT 7;30 PM. AND DRIVER 1 SITE MULE 1
SWITCHED TO 7 '7. T-74 WENT TO WHITESTONE 1 DUMP TRUCKS
AND T-27 WAS E OUGHT BACK. 10 WHEEL DUMP TRU CK
T-75 PULLED OF AT11;55ANDBACKAT1:10 FLASHING ARROW BOARD 1
T-76 PULLED OF AT 11:55 AND BACK AT 1:10 OFFICE TRAILER/GENER. 1
CARGO BOXES 4
FLAT TRUCK
PUMP 2
ROLLER
RAINMAKER/GENIE LIFT 1
Description of Wo k;
[ANTICIPATE^ JRK_______________________________________________________________________
[continue REM )VING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT
rSTATIONS FOR DUST CONTROL
[MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA
[2 MACHINES AtIeVELS B-5, 2 MACHINES AT LEVEL B-6; EL 242
■6 IN MER ROOM & REMOVE ALL PIPING ON B-6