Description of Work:_________________________________________________________________________
COMPLETED V/ORK________________________________________________________________________
CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT
MAN WATERING STATIONS FOR OUST CONTROL_______________________________________________
MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA______________________________________________
3 MACHINES AT LEVELS B-5. ONE MACHINE AT LEVEL B-S; EL 242
LOADS OUT:
YUKES OUT: —————————————