tAQ^ CONTRACTING CORP. iSeihRoad. Whitestone. NV. 11357.(718)787-3000 DATE; DECEMBER 18, 2001 (NIGHT FINAL) 6:00AM DAILY WORK FORCE REPORT
Ijob Name & Location: World Trade Center Contract No. Weather Conditions WINDY & SEASONABLY COOL
r Labor QUANT. Equipment Description MANNED STANDBY IDLE CLASSIFICATION Superintendent_______ _____________ 1 :AT 966 LOADER 1 PROJECT ENGINEER 1 •IT 446 BACKHOE 1 [office ENGINEER AT 973 LOADER 1 [foremen 2 :AT 365 GRAPPLER 1 SAFETY OFFICER AT 375 GRAPPLER 1 LABORERS 18 IITACHI750 GRAPPLER 1 IRON WORKERS IITACHI550 GRAPPLER 1 [[local 14 5 IHITACHI 550 BACKHOE 1 [local 15 ......... 8 HITACH11200 GRAPPLER 1 CARPENTER 165 CFM COMPRESSOR 1 CARPENTER FOREMAN_______________ ___ ■ 235 HAMMER HOE RAM 1 TEAMSTERS____________________________ ___ 1 ■ MECHANICS TRUCK 1 1 MECHANICS____________________ ________ _ 1 ■ TOOL TRUCK HOUSE WRECKERS 10 ■ TOOL VAN ■ ■ ROLL OFF ■ DUMP TRAILERS ■ LOW BED TRAILER W^fcjpYoP IN AREA OF SLURRY WALL DIGGING ■ HIGH DECK TRAILERS ] off FOR NICHOLSONS HANGING LEADS @ W13 ■ WELDING TRUCK 1200/365 DIGGING INTO PILE NORTH OF VISTA & ■ FUELTRUCK 1 EUKES (1- GRACE, 3- TULLY) ■ PICKUP TRUCKS 2 750 & 973 ALSO IN AREA LOADING ILIGHT TOWERS 13 MA2ZOCCHI LOADING OUR OTHER THREE EUKES SITE MULE 3 RECEIVED SECOND EUKE TONITE WITH 550 DUMP TRUCKS BUCKET. KIETH TOOK OFF GAREWAYS BUCKET 10 WHEEL DUMP TRUCK FROM OUR 550 & PUT OUR BUCKET ON. FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 - CARGO BOXES 4 FLAT TRUCK 1 TRUCKING SUMMARY ON SEPARATE SHEET 1PUMP ~ 2 IIroller 1 1RAINMAKER/GENIE LIFT 1 t— Description ol Work:
MAN TARPING AND TRIMMING STATIONS________________________________________________ MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA________________________________________ MAN WATERING STATIONS FOR DUST CONTROL____________________ ____________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND EAST OF CHILLER PLANT
GRACE CONTRACTING CORP [Approved By: ~ BY: SUPERINTENDENT \ 04.028481 DAILY WORK FORCE REPORT 12iaN.xls
CITY_21MC100_004198352
NYC-WTC_000432519
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000389500
Night final daily workforce report for World Trade, Dec 18, 2001.
2 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305054
Night final daily workforce and equipment summary for World Trade Center site, December 2001.
2 shared non-person entities · 1 shared topics · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419252
Night final daily workforce and equipment at World Trade site, December 13, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000268597
Daily labor roster listing classifications and equipment for a construction site.
2 shared non-person entities · 1 shared topics · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322141
Final daily workforce and equipment inventory for World Trade Center site, December 7, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305379
Night final daily workforce report for World Trade Center site, Dec 7, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419227
Night shift daily workforce entry for World Trade Center project, Dec 24, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278568
Night daily workforce with equipment at World Trade Center site, Nov 9, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388392
Night final daily workforce at World Trade Center, Dec 18, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280809
Night final daily workforce and equipment at World Trade, Jan 5, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305531
December 18, 2001 night final daily workforce report for World Trade site.
2 shared non-person entities · 1 shared topics · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290109
Daily labor roster and equipment assignments for site at World Trade Center.
2 shared non-person entities · 1 shared topics · similarity 0.945
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000389500
Night final daily workforce report for World Trade, Dec 18, 2001.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305054
Night final daily workforce and equipment summary for World Trade Center site, December 2001.
Similarity score 0.980 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419252
Night final daily workforce and equipment at World Trade site, December 13, 2001.
Similarity score 0.976 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000268597
Daily labor roster listing classifications and equipment for a construction site.
Similarity score 0.976 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322141
Final daily workforce and equipment inventory for World Trade Center site, December 7, 2001.
Similarity score 0.974 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305379
Night final daily workforce report for World Trade Center site, Dec 7, 2001.
Similarity score 0.974 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000389500
Night final daily workforce report for World Trade, Dec 18, 2001.
Similar indexed content
NYC-WTC_000305054
Night final daily workforce and equipment summary for World Trade Center site, December 2001.
Similar indexed content
NYC-WTC_000419252
Night final daily workforce and equipment at World Trade site, December 13, 2001.
Similar indexed content
NYC-WTC_000268597
Daily labor roster listing classifications and equipment for a construction site.
Similar indexed content
NYC-WTC_000322141
Final daily workforce and equipment inventory for World Trade Center site, December 7, 2001.
Similar indexed content