Daily workforce allocation and equipment at World Trade site, Dec 12, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗Final daily workforce report for World Trade Center site, Dec 12, 2001.
NYC-WTC_000432506OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151-45 61h Road, Whiiesione. NY. 11357- (718) 767-9000 DATE; DECEMBER 12, 2001 (DAY) FINAL DAILY WORK FORCE REPORT
I
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor Equipment _______________ CLASSIFICATION QUANT. Description MANNED STANDBY) IDLE SUPERINTENDENT 1 ICAT 966 LOADER 1 PROJECT ENGINEER 2 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 23 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 11lOCAL15 1 10 HITACHI 1200 GRAPPLER CARPENTER ' 1 185 CPU COMPRESSOR 1 I CARPENTER FOREMAN 1 235 HAMMER HOG RAM 1 TEAMSTERS 1 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK 1 HOUSE WRECKERS 9 TOOL VAN 1 ROLL OFF DUMP TRAILERS ■ LOW BED TRAILER DELIVERIES; AWISCO ■ HIGH DECK TRAILERS WELDING TRUCK 1 ■ FUEL TRUCK____________ 1 ' PICKUP TRUCKS 9 ' LIGHT TOWERS 13 ■ SITE MULE 3 ■ DUMP TRUCKS ' 10 WHEEL DUMP TRUCK ' FLASHING ARROW BOARD 1 ■ OFFICE TRAILER/GENER. 1 ‘ CARGO BOXES 3 ' FLAT TRUCK 1 [LIGHT TOWERS USED FOR 2.5 HOURS IIPUMP 2 IjROLLER ~ 1 IRAINMAKER/GENIE LIFT 1
Description of Work;
LOAD OUT STEEL AND DEBRIS_________________________________________________ MANNED TARRING AND TRIMMING STATIONS___________________________________ MANNED WATER STATIONS FOR DUST CONTROL_____________________________ __ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA_________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 INSTALLATION OF GPS SYSTEMS_______________________________________________ ELEVATIONS: ALL MACHINES LEVEL B-5 253______________________________ ' LOADS OUT 46 , ■ GRACE CONTRACTING CORP Approved By: Title; For; suPERiNreNoeNT -.
04.028467 DAILY WORK FORCE REPORT 1212D.xls
CITY_21MC100_004198338
NYC-WTC_000432506
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000389487
Daily workforce allocation and equipment at World Trade site, Dec 12, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267227
Night preliminary daily workforce and equipment for World Trade Center, Dec 13, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302472
Night preliminary daily workforce and equipment for World Trade site, Dec 19, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386652
Day shift daily workforce and equipment listing for World Trade site, Dec 13, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280754
Final page: World Trade Center workforce and equipment, Dec 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302428
Final daily workforce report for World Trade Center site with equipment rundown.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419132
Day final daily workforce report for World Trade Center with heavy equipment.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000281690
Daily workforce report listing personnel and equipment for World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290080
Night preliminary daily workforce and equipment for World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432473
Day final daily workforce and equipment report for World Trade Center, Nov 25, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269184
Night shift daily workforce with equipment allocations for World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388263
Night shift daily workforce for World Trade Center site, November 28, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000389487
Daily workforce allocation and equipment at World Trade site, Dec 12, 2001.
Similar indexed content
NYC-WTC_000267227
Night preliminary daily workforce and equipment for World Trade Center, Dec 13, 2001.
Similar indexed content
NYC-WTC_000302472
Night preliminary daily workforce and equipment for World Trade site, Dec 19, 2001.
Similar indexed content
NYC-WTC_000386652
Day shift daily workforce and equipment listing for World Trade site, Dec 13, 2001.
Similar indexed content
NYC-WTC_000280754
Final page: World Trade Center workforce and equipment, Dec 5, 2001.
Similar indexed content