Daily work force report, World Trade, Dec 3 2001

Machine-extracted title · confidence 38%

Final daily workforce report for World Trade Center construction, Dec 3, 2001.

NYC-WTC_000432489
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151.45 BIh Road. Whitestone. N.Y. 11357-(718) 76T-900O DATE: December 3, 2001 MONDAY FINAL

DAILY WORK FORCE REPORT

Job Name & Location; World Trade Center Contract No. Weather Conditions

Labor I I Equipment CLASSIFICATION QUANT. IIt Description MANNED STANDBY IDLE [SUPERINTENDENT 2 If CAT 966 LOADER 1 PROJECT ENGINEER i If CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 [safety OFFICER 1 1 CAT 375 GRAPPLER LABORERS 19 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER ' 1 LOCAL 14 9 HITACHI 550 BUCKET 1 LOCAL 15 14 HITACHI 1200 GRAPPLER 1 IlCARPENTER 1 185 CFM COMPRESSOR 1 [carpenter foreman 2 235 HAMMER HOE RAM 1 TEAMSTERS 10 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK 2 HOUSE WRECKERS 5 TOOL VAN 1 ROLL OFF DUMP TRAILERS 7 LOW BED TRAILER • DELIVERIES; HIGH DECK TRAILERS 2 6 FREON DETECTORS WELDING TRUCK FUEL TRUCK 1 6 LOADS DOT MILLINGS PICKUP TRUCKS 5 LIGHT TOWERS 13 SITE MULE 3 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 NOTE: 13 LIGHT TOWERS USED 2.5 HOURS ' FLAT TRUCK 1 ■ PUMP 2 1 ROLLER 1 ' RAINMAKER/GENIE LIFT 1

Description of Work: LOADS OUT: LOADS OUT: 55 TRAILERS__________________________________________________________________________________ LOADS OUT. 11OYUKES____________________________________________________________________________________ LOAD OUT STEEL AND DEBRIS ________ _____________________________________________________________ MANNED TARPING AND TRIMMING STATIONS________________________________________________________________ MANNED WATER STATIONS FOR DUST CONTROL____________________________________________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA_______________ ______________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC’S ROADWAY PREP FOR THE BURNING OF THE SW CORNER COLUMN BEAMS

GRACE CONTRACTING CORP /T Approved By: Title: For: SUPERINTENDENT

DAILY WORK FORCE RePORT1203D.xls 04,028449

CITY_21MC100_004198320

NYC-WTC_000432489

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000432489Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →