Daily work force report, World Trade Center, Oct 2001

Machine-extracted title · confidence 32%

Daily labor and equipment counts for World Trade Center site, Oct 22, 2001.

NYC-WTC_000432427
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE COMTRACTING CORP. ISi-tSethRoad, tYhitestone. N.V 11357-(713) 707-9000 DATE. 10-22X51 DAY FINAL

DAILY WORK FORCE REPORT

Job Name & Location; World Trade Center Contract No. Weather Conditions

Labor I Equipment CLASSIFICATION quantitI Description MANNED IDLE SUPERINTENDENT CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 245 GRAPPLER SAFETY OFFICER 1 CAT235GRAPPLER LABORERS 19 CAT 37 S GRAPPLER 1 IRON WORKERS 1 CAT 365 GRAPPLER 1 LOCAL 14______________ 4 HITACHI 750 1 LOCAL 15 6 HITACHI 550 GRAPPLER 2 CARPENTER HITACHI 1200 1 CARPENTER FOREMAN 1 COMPACTION TRUCK TEAMSTERS 18 MECHANICS TRUCK 2 MECHANICS___________ 3 TOOL TRUCK 2 HOUSE WRECKERS 3 TOOLVAN_____________ 1 ROLLOFF 1 DUMP TRAILERS 5 C\L>j , 7, CL ctj LOW BED TRAILER 1 HIGH DECK TRAILERS 7 G. Ye-I A C. o WELDING TRUCK 2 FUELTRUCK 1 PICKUP TRUCKS 5 LIGHT TOWERS 8 PARTS TRUCK 1 DUMP TRUCKS 10 WHEEL DUMP TRUCK LIQUID OXYGEN 9 OXYGEN TRAILER 1 OXYGEN 80 ACETELYNE (MED) 10 ACETELYNE (LARGE) 20 J OFFICE TRAILER 1 I TUBE TRAILER ~ 3 Descriplion of Work; ____________________________________ REMOVE STEEL AND DEBRIS EAST WALL NORTH EAST CORNER VISTA HOTEL ANO WEST WALL TOWER 2 3 - DELAYS TOTALING 3.5 HOURS DUE TO FIRE DEPT. SEARCH & RESCUE ON TOP OF PILE WEST WALL TOWER 2._____________________________________________________________________________________________ MANNED TARPING STATION_____________________________________________________________________ __ MANNED WATER STATION FOR DUST CONTROL MAINTAINED TRAFFIC FLOW IN AND OUT OF WORK AREA_______________________________________________ 109 LOADS REMOVED( 90 ON GRACE TRUCKING)

GRACE CONTRACTING CORP Approved By. Title. BY: For: SUPERINTENDENT

CITY_21MC100_004198243

NYC-WTC_000432427

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000432427Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000408021

Final daily workforce report for World Trade Center project.

Similar indexed content

Compare copies and versions →