NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 5 pages

EE&G supplement to Oct 2001 sampling data, Staten Island

Machine-extracted title · confidence 32%

Supplement to EE&G October 2001 sampling data for asbestos, metals and total particulates; DSNY.

NYC-WTC_000432219–000432223
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Mr. Steve Thompson October 24,2001 Page 4

a low asbestos structure count as a result of NIOSH Method 7402 analysis correlates to the absence of asbestos fibers. Asbestos structures smaller than the size counted in TEM Method 7402 could still present a health risk. There is no known safe level of exposure to airborne asbestos.

• Dust generation has been observed during off loading of debris, in particular when the debits Is dry. This, combined with the air sampling results to date, lead EE&G to recommend that this area be designated an exdusion zone and included under the Health and Safety Plan. Various dust suppression alternatives are currently being examined for marine transfer operations. Until an effective dust suppression procedure can be put in place, personal protective equipment will be the primary method of worker protection. Consideration should be given to using a fine mist spray on loads that are dry. and/or in the unloading storage bunkers. Ail workers in the immediate vicinity of the loading operations should be wearing respiratory protection (OV/HEPA cartridge), Tyvek protective coveralls, hard hats, steel-toed boots, safety goggles, and gloves. These workers should be required to pass through a personal hygiene station (Hke at the top of the landfill) prior to taking lunch breaks or going home for the day. As an exclusion zone, further monitoring of the employees should be conducted.

• As per OSHA requirements, the results of the air sample data must be transmitted to the effected employees, including all employees in toe same job function, within 15 days of receipt of the lab data. While the analysis of the samples (#’s 101701JF11 and 101701PH02) by TEM suggests that the fibers reported in the data from analysis by PCM are not asbestos (note size limitations of analysis, as discussed above), the exceedance of the OSHA PEL cannot be disregarded. EE&6 recommends that both sets of data be presented and explained to the affected individuals), if requested, EE&G representative will be available to assist the client in performing this task.

Please call us have any questions regarding this correspondence. As always, we are ready to assist illips & Jordan upon a moment's notice.

Sincei

4 Jay Senii r Sall. C.I.H. Industrial Hygienist EE&j

pmothy R. Gipe /^resident EE&G

TRG/JWS:jws

05216 CONFIDENTIAL, CITY_2IMCl00_010710756 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000432222

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000432222Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →