Daily work force report, World Trade Center, Nov 8, 2001

Machine-extracted title · confidence 40%

Day shift workforce and equipment summary for World Trade Center site operations.

NYC-WTC_000429679
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

^fcGRACE CONTRACTING CORP. /^^Pr51-45 eih Road, Willestone, N.Y. 11357-(7iB)767-sooa DATE: NOVEMBER B, 2001 (DAY FINAL)

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor I Equipment jpWNED CLASSIFICATION UANTIT Description MANNED [STANDBY iDLEllRENTED SUPERINTENDENT 2 CAT 9SS LOADER 1 GRACE PROJECT ENGINEER 2 CAT 445 BACKHOE 1 GRACE OFFICE ENGINEER 1 CAT 973 LOADER 1 GRACE 'FOREMEN 1 CAT 365 GRAPPLER 1 HO PENN SAFETY OFFICER 1 CAT 375 GRAPPLER 1 HO PENN LABORERS 22 HITACHI 750 GRAPPLER 1 DYNAMIC IRON WORKERS 1 HITACHI 550 GRAPPLER - 1 DYNAMIC LOCAL 14 6 HITACHI 550 GRAPPLER 1 . DYNAMIC LOCAL 15 8 HITACH11200 GRAPPLER 1 DYNAMIC CARPENTER COMPRESSION TRUCK CARPENTER FOREMAN 3 MECHANICS TRUCK 2 TEAMSTERS 15 TOOL TRUCK 2 MECHANICS 2 TOOL VAN 1 HOUSE WRECKERS 4 ROLL OFF DUMP TRAILERS 11 LOW BED TRAILER HIGH DECK TRAILERS 3 WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 5 LIGHT TOWERS 8 PARTS TRUCK 1 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER 1 TUBE TRAILER 3 FLAT TRUCK 185 CFM COMPRESSOR 1 DYNAMIC PUMP 1

Description of Work:___________________________________________ LOADS PUT: 92_____________________________________________ MAN TARPING AND TRIMMING STATIONS_______________________ MAN WATER STATIONS FOR DUST CONTROL____________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA_________________ CONTINUE REMOVING DEBRIS FROM TOWER 2__________________ DELAY: TWO 550s HAD FRESH AIR SYSTEMS INSTALLED__________ DELAY: ONE MAN AND TRUCK USED 4 HOURS, UNMANNED 8 HOURS

GRACE Cl Approved By: Title:_______ For; “SJ SUPERINTENDENT

02.200021 CITY_21MC100_004144384

NYC-WTC_000429679

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000429679Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →