Dewatering operations log, World Trade Center, Jul 2002

Machine-extracted title · confidence 42%

Daily log of dewatering work in basement and Hudson station related to World Trade Center site.

NYC-WTC_000429670
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

MORETRENCH AMERICAN CORPORATION Page 1 of 1

Date 7/17/02 DAILY LOG Day Wednesday

Contractor Bovis Job Name World Trade Center Job No._______ 4906

Work Performed Today ___________________________ Weather Operate and maintain dewatering system in basement of south projection.

Operate and maintain dewatering system in the Hudson station. Temp AM PM Fused the 8* discharge line for the north sump. Used Nicholson's picker to set pipe in place

and bolted up it up. A very high water flow started leaking around the trumpet on panel W 38 Safety Meeting ___________ we drilled relief holes and speed creted around the trumpet. In order to let the speedplug set ssass=as=s=ssss up we ported in 1/2* pipes and ran hoses to the sumps due to the high water flow aprox. Work Force Day

GPM'S We will shut it off in the am with the chem grout. Had to keep 2 men late to finish the Foreman 1 speed Crete. Loaded out a truck load of fittings and old hose. Cleaned our storage area. Technician 1 Sand Hogs 4 Operating Eng. 4 Drillers

Oilers 0

Total 10

EQUIPMENT Cat IT 28 with forks 12hrs 4- grout pumps 12hrs General/Subcontractors Progress 3-3* Trash Pump 12hrs 2-2'Test Pump 12hrs 500gal Settling Tank 12hrs 2-12’Cut Off Saw 12hrs 2 • Service Truck 12hrs 8-Road Plates 12hrs Equipment 2-75 kw gen sets 12hrs Extra Work 5 • Hilti Concrete Drill 3.88 KW generators 12hrs 8 - 5000 watt generator 2- Double thro Switch* 12hrs 3 ■ 30hp tunnel pump with controls 12hrs 4* X 12' Fusion Unit 12hrs 1-275 Gal dual contained fuel tank 12hrs 15 ■ 2* sump pumps 12hrs 2-6hp high head pump 12hrs 1- Pump op trailer 12hrs 300’ of 6' Alum. Pipe and 4 flowmeters. 1 - Storage container 12hrs rX4’ Fusion Machine 4- Diesel Gators 12hrs 4 • 3* submerisable pumps 1-15hp pump &con 12hrs

S ‘Kfi'ngfeT 01.813677 M T A •7|<

nt CITY_21MC100_004143387

NYC-WTC_000429670

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000429670Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →