NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

WTC Recovery project notes, 2002

Machine-extracted title · confidence 25%

Progress notes on WTC Recovery, equipment usage logs, and administrative close-out tasks.

NYC-WTC_000429665
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

WTC Recovery Page 2 4/15/2002

Tumer/Plaza continues with an in-depth analysis and review of Season’s equipment usage. ^^asons recently submitted bill package is being compared to Tumer/Plaza records and audited. The package is being checked for all proper back-up and verified that it ties out to corresponding bill. Also, an in-depth comparison of Bay Cranes current rates to pre-September 11, rates is also being conducted.

Tumer/Plaza submitted to the DDC this week; Seasons equipment usage logs, the break out of fuel costs, equipment operating costs and re-calculated rates. This is a significant step towards closing-out Seasons contracting.

We have also submitted a number of approval letters for the purchase of office equipment used by Tumer/Plaza during the WTC Recovery Project. An approval letter was also submitted for Canron’s supervision during the clean-up effort. Tumer/Plaza is awaiting a response from the DDC regarding all outstanding approval letters.

T/P office staff has also been working on subcontractor approvals, rate approvals, and overall project documentation. • Continued review of Arthur Andersen’s Compliance reports. • Submitted rate documentation for Total Safety Consulting. • Compiling all Subcontractor close-out documents including insurance and Vendex forms. B • Also continued with submission of Narratives and other DDC required documentation. • Daily submission of the Daily Shift Report continued.

DDC Engineer - Cecilia Figueroa - worked all week at the DDC offices on the 30®* floor of the AMEX building. Cecilia performed all functions as required by Samir Shah, Al Eldin, and Tom Foley primarily, and helped out as time permitted, and the office needs required.

T/P continued to collect and review subcontractor invoices and compile same for billing to the DDC. • Compiling responses to exceptions reports received from the DDC. • Review the EAO audit of previous bills and work on satisfying all exceptions. Communicated to the subcontractors in order to ensure they understood the EAO exceptions to their bills, and get a timely response. Worked to compile corrections to previous bills for submission to DDC. • Correcting all Subcontractor invoices with Subcontractors to reflect any changes and rate agreements. • Continued a comprehensive study of Equipment Rates, invoices and verification processes.

Parsons Group continued reviewing for accuracy all T/P sign-in/out sheets and the assembling of invoices and other functions including the response to EAO exceptions reports. In an effort Page 2 of 3 13,000103

CITY_21MC100_004109464

NYC-WTC_000429665

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000429665Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →