PROJECT OBJECTIVE(S) (1910.120(b)(3))
(Description of work area activities planned)
General Site monitoring for physical and chemical hazards including air contaminants (dust, volatile
Qrganics compoundsi metals,, and other specific compounds as required)
C. PROJECT ORGANIZATION (1910.120(b)(2))
Type of Date of
Team Member Responsibility Training Training
40-Hr. OSHA
Latest 8-Hr. OSHA
David Chang___ __ Pro) Manag^er____
40-Hr. OSHA
Latest 8-Hr. OSHA
Mike Donovan Prop Mgr. & Health & Safety
40-Hr. OSHA
Latest 8-Hr. OSHA
See Attached list for additional personnel
E. CHEMICAL HAZARD ANALYSIS (1910 120(b)(4))
Flash Routes of
Contaminant IP PEL/TLV IDLH LEL/UEL Point Exposure
Asbestos N/a 0 2 fibers/cc air N/A ' N/A nTa Inhalation
Crystalline Silica 0.05 mg/M" N.'A N/A N/A Inhalation
Respirable
Dust
Carbon Mono.xide 35/50 ppm 1200 ppm Inhalation
Lend 50 iig'M’ Inhalation
Benzene 30 mg/M’ 500 ppm 1.2% 12" F. Inhalation,
absorption,
ingestion
Gnsoliiie ; 300 ppin N/A 1.2.-7.6 45“ F- Inhalation,
absorption.
ingestion
Diesel Fuel N/A N/A 0.6/7.5 120" F Inhalation,
absorption,
ingestion
NOTE: Material Safety Data Sheets attached for all substances identified above. Also see Section (M)(2).