NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Additional work authorization, Trade Center project, 2001

Machine-extracted title · confidence 26%

Contractor contact and job details for added work at World Trade Center site.

NYC-WTC_000429453
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ADDITSONAL WORK AUTHORIZATION IWAZZOCCHI WRECKING it 32 WILLIAMS PARKWAY R O. BOX 331 EAST HANOVER, NJ 07936-0331 D/IVSHrFT PHONE: (973) 884-8682 FAX: (973) 377-7464 name”'® Evergreen Recycling Of Corona (EROC) ’’”1^18] 446-7000 JOB NAME JOB NUMBER Willets Point Boulevard World Trade Center CITY STREET Corona New York EXISTING CONTRACT NUMBER DATE OF EXISTING CONTRACT CITY STATE New York City Mew York . You are authorized to perform the following specifically described additional work; 2 Cat 246 Skid Steer LI Hitachi 450 w/Grapple I Campbell Housfeld Compressor Hitachi 550 w/Grapple I Ingersoll Rand Air Compressor 12 -Hitachi 750 w/Grapple Miller Maintenance Trailers Hitachi 1200 w/Grapple 1 Welders Maintenance Trailers 1 2 1 Mobile Power Washer LZ -- Mechanics w/Service Trucks Roll-Off Truck{s) Atlas Fork Lift {32E) 2 Service Trucks I2 Foreman 12 Man Basket /Z S~ Burners , 7:3. Z Tractor TrafTer(s) 50 CY Laborers — Tractor Trailer(s) Low Bed 2 Mechani cs /F/ la. 1 Kobelco 850 12. “— Oilers - Melrose 853 Bobcat y Operators y 1 Brokk 180 Robot I 2, 2- Working Supervisors / 2. I Brokk 250 Robot Iz —■ Safety Supervi sors > Iz Generator(s) -- Truck Drivers J__ Cy<tr<x4TsC5 L2. ) Lixtorer 2 ADDITIONAL CHARGE FOR ABOVE WORK IS: $ Payment will be made as follows:

Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.

Date Authorizing Signature (OWNER SIGNS HERE)

Wb hereby agree to furnish labor an^aterials - complete in accordance with the above specifications, at above stated price.

ed Signature n>. “2- (CONTRACTOR SIGNS HERE)

THIS IS CHANGE ORDER NO. J12JU746flr.... NOTE: This Revision becomes part oi, and in conformance with, the existing contract. z CITY_21MC100_001048082 NYC-WTC_000429453

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000429453Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000182352

Work authorization form issued to Iwazzocchi Wrecking for additional work at the World Trade Center site.

Similar indexed content

NYC-WTC_000356511

Work authorization form for Mazzochi Wrecking; Trade Center job referenced.

Similar indexed content

Compare copies and versions →