machine-extracted · confidence unavailable · Check page ↗Day shift daily workforce and equipment details for World Trade site on 1/20/02.
NYC-WTC_000429397OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. ISMS sth Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE: 1/20/02 DAY FINAL
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor I Equipment CLASSIFICATION QUANT. I Description MANNED STANDBY IDLE SUPERINTENDENT CAT 966 LOADER 1 PROJECT ENGINEER CAT 446 BACKHOE 1 OFFICE ENGINEER_________________________ |CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 9 CAT 375 GRAPPLER 1 IRON WORKERS HITACHI 750 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 4 HITACHI 550 GRAPPLER 1 CARPENTER HITACHI 1200 GRAPPLER 1 CARPENTER FOREMAN 2 185 CFM COMPRESSOR 1 TEAMSTERS (FUEL) 1 235 HAMMER HOE RAM MANNED BY TULLY TEAMSTERS (FLATBEDS, DUMPS, AND EUKES) 10 MECHANICS TRUCK 2 MECHANICS 3 TOOL TRUCK 1 HOUSE WRECKERS 5 TOOL VAN ROLL OFF DUMP TRAILERS LOW BED TRAILER DELIVERIES: HIGH DECK TRAILERS WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 1 LIGHT TOWERS 5 SITE MULE DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK PUMP 2 RAINMAKER/GENIE LIFT 1
Description of Work: WORK COMPLETED__________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA______________ LOADS OUT:________________________________________________ EUKES OUT:
GRACE CONTRACTING CORP Approved By: BY: Title; For; SUPERINTENDENT
DAILY WORK FORCE REPORT0120D.xls 02.214758
CITY_21MC100_001046853 NYC-WTC_000429397
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000429459
Day shift workforce and equipment at the World Trade Center project.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356570
Daily labor/equipment roster for World Trade site, Jan 27, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305184
Daily workforce and equipment details for World Trade, Jan 29, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356564
Daily labor/equipment roster for World Trade site, Jan 24, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356576
Day shift daily workforce and equipment roster for Grace Contracting at World Trade Center site, January 2002.
1 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429395
Day shift daily workforce and equipment details for World Trade site on 1/19/02.
1 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302459
Day final daily workforce and equipment for World Trade project, Dec 23, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280006
World Trade Center site labor and equipment by Grace Contracting, December 3, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429460
Night shift daily workforce and equipment at World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305120
Daily labor force and equipment listing for World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388491
Preliminary daily workforce and equipment at World Trade site, Grace Contracting, Nov 22, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305509
Day FINAL daily workforce and equipment for World Trade Center site, February 2002.
1 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000429459
Day shift workforce and equipment at the World Trade Center project.
Similar indexed content
NYC-WTC_000356570
Daily labor/equipment roster for World Trade site, Jan 27, 2002.
Similar indexed content
NYC-WTC_000305184
Daily workforce and equipment details for World Trade, Jan 29, 2002.
Similar indexed content
NYC-WTC_000356564
Daily labor/equipment roster for World Trade site, Jan 24, 2002.
Similar indexed content
NYC-WTC_000356576
Day shift daily workforce and equipment roster for Grace Contracting at World Trade Center site, January 2002.
Similar indexed content