Daily work force report, World Trade, Jan 2002

Machine-extracted title · confidence 28%

Night final daily workforce and equipment listings for World Trade site, Jan 2002.

NYC-WTC_000429390
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-46 6th Road. Whitestone, N.Y. 11357-(718) 767-9000 DATE: 1/16/02 NIGHT FINAL

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 8 CAT 375 BUCKET 1 IRON WORKERS HITACHI 750 GRAPPLER 1 LOCAL 14 5 HITACHI 550 BUCKET 1 LOCAL 15 7 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS (FUEL) 1 MECHANICS TRUCK 1 1 MECHANICS 2 TOOL TRUCK HOUSE WRECKERS 3 TOOL VAN TEAMSTERS (FLATS, DUMPS, AND EUKES) 10 ROLL OFF DUMP TRAILERS LOW BED TRAILER DELIVERIES: HIGH DECK TRAILERS WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 3 LIGHT TOWERS 5 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK 1 PUMP 2

■

Description of Work: COMPLETED WORK__________________________________________________________________________________ CONTINUED REMOVING DEBRIS FROM NORTH HALL ROAD AND LOWER LEVELS OF TOWER 1 TO ACCOMMODATE NEW BRIDGE._______________________________________________________________________________________ MAINTAINED TRAFFIC INTO AND OUT OF AREA__________________________________________________________ 1200 WORKING VERY SLOWLY DUE TO FDNY RECOVERY ACTIVITY_________________________________________ EXCAVATED MILLINGS ON WEST STREET WITH 550 BUCKET AND 973 LOADER_______________________________ LOADS OUT: 66____________________ EUKES OUT: 178

GRACE CONTRACTING COR^ 0 ..^ Approved By: Title: For: SUPERINTENDENT

DAILY WORK FORCE REPORT0116N.xls 02.214647

CITY_21MC100_001046800 NYC-WTC_000429390

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000429390Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000356549

Night final daily workforce and equipment roster for World Trade site, Jan 16, 2002.

Similar indexed content

Compare copies and versions →