NYC-WTC_000305146
Day shift daily workforce and equipment at World Trade site, Jan 9, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗Day shift daily workforce and equipment list for World Trade site, Jan 2002.
NYC-WTC_000429375OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151-»5 6th Road. Whitestone, N.Y. 11357-(718) 767-9000 DATE: 1-9-02 DAY FINAL
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 1 ■ CAT 966 LOADER 1 PROJECT ENGINEER 2 ■ CAT 446 BACKHOE 1 OFFICE ENGINEER ■ CAT 973 LOADER 1 FOREMEN 1 ■ CAT 365 GRAPPLER 1 SAFETY OFFICER ■ CAT 375 BUCKET 1 LABORERS 20 ■ CAT 375 GRAPPLER 1 IRON WORKERS ■ HITACHI 750 GRAPPLER 1 LOCAL 14 6 ■ HITACHI 550 BUCKET 1 LOCAL 15 9 ■ HITACH11200 GRAPPLER 1 CARPENTER ■ 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 ■ 235 HAMMER HOE RAM 1 TEAMSTERS 1 ■ MECHANICS TRUCK 2 MECHANICS 2 ■ TOOL TRUCK HOUSE WRECKERS 6 ■ TOOL VAN 1 ■ ROLLOFF ■ DUMP TRAILERS ■ LOW BED TRAILER DELIVERIES: ■ HIGH DECK TRAILERS WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 5 LIGHT TOWERS 15 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK •LIGHT TOWERS USED FOR 2 HOURS DURING DAY FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 4 FLAT TRUCK 1 PUMP 2 RAINMAKER/GENIE LIFT 1
Description of Work: COMPLETED WORK CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA MAN WATERING STATIONS FOR DUST CONTROL___________________________________________________ LOADS OUT: 106_______________________________________________________________________________ EUKESOUT: 192
GRACE CONTRACTING COI Approved By: J B Y: / Title: For: SUPERINTENDENT
DAILY WORK FORCE REPORT0109D.xls Q2.214622
CITY_21MC100_001046785 NYC-WTC_000429375
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000305146
Day shift daily workforce and equipment at World Trade site, Jan 9, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290064
Daily workforce roster listing equipment and personnel at World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356535
Day shift daily workforce and equipment roster for World Trade project, Jan 2002.
3 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305446
Final daily crew and equipment listing for World Trade Center construction site, Jan 14, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342286
Day-time daily workforce report listing personnel and equipment.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305155
Daily workforce and equipment listings for World Trade site, January 2002.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419294
Day final daily workforce report detailing personnel and equipment at World Trade Center site.
3 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429385
Day shift workforce and equipment entries for World Trade site, Jan 2002.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429374
Night shift daily workforce and equipment list for World Trade site, Jan 2002.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290067
Day final daily workforce and equipment at World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279960
Daily workforce summary with equipment and personnel at World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429465
Day shift daily workforce and equipment for World Trade Center project.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000305146
Day shift daily workforce and equipment at World Trade site, Jan 9, 2002.
Similar indexed content
NYC-WTC_000290064
Daily workforce roster listing equipment and personnel at World Trade Center site.
Similar indexed content
NYC-WTC_000356535
Day shift daily workforce and equipment roster for World Trade project, Jan 2002.
Similar indexed content
NYC-WTC_000305446
Final daily crew and equipment listing for World Trade Center construction site, Jan 14, 2002.