NYC 9/11 Public Portal Document
Ambient Air Monitoring Program Section No. 14
Quality Assurance Project Plan Revision No.: 0
130 Liberty Street - NY, NY Date: August 2005
Lower Manhattan Development Corporation Page 98 of 116
in the field office. As forms are completed, they will be kept in a three-ring notebook in the field
office.
As with the field logbooks, all documentation will be recorded in permanent ink. Corrections to
errors in documentation or recorded calculations will be made by first striking out the error with
a single line so as not to obliterate the original entry. Then the replacement entry or value will be
inserted where appropriate. The person originating the change will initial and date each separate
change. All revisions, deletions, and changes will be made in indelible ink.
14.1.4 Photographs
Field personnel will be instructed to photo-document field activities where possible. A field
logbook entry or Photograph Log will be used to record the date and time of all photographs
taken at the site.
14.1.5 Equipment Calibration Log
A field logbook entry or daily log will be used to record which instruments were calibrated each
day (identified by manufacturer, model number and serial number), the individual who
perfoimed the calibration, and any notes regarding the maintenance of the instntment.
14.1.6 Health and Safety Log
A field logbook entry or a Health and Safety Log will be used to record any Health and Safety
issues that arise during field activities. Any injuries, illnesses, use of first aid supplies, use of
personal protective equipment (for levels A, B or C only, if needed), or possible work-related
symptoms will be recorded in the log together with the date, the name(s) of the affected
individual(s), and a description of the incident.
14.2 Field Documentation Management System
The TRC Field Sampling Coordinator will maintain an inventory of all logbooks used during the
program and will be responsible for ensuring that they are archived in the project files following
the completion of the investigation.
Completed standardized forms will be maintained by the TRC Field Sampling Coordinator
during the duration of the program and will be archived in the project files following completion
of the sampling effort.
14.2.1 Sample Handling and Tracking System
This section documents the procedures that will be followed to identify and track samples
collected in the field, samples delivered or shipped to a fixed laboratory for analysis, and sample
transfer throughout the laboratory.
L2005-346 Rev. 1
C ITY_D E P_WO RB Y_C AN N ATA_SU B P_000114739
NYC-WTC_000428422
OCR can misread numbers and units. Confirm readings against the page image before using them.