NYC 9/11 Public Portal Document
Part V - Quality Assurance Project Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701 - September 29, 2005
• New York City Department of Buildings
• New York State Department of Transportation
• New York City Department of Transportation
• New York City Office of Emergency Management - Fire Department of New York -
New York Police Department - New’ York City Department of Health and Mental
The Greenwich Street Project, LLC received comments from regulatory agencies in
September, 2005 and amended the draft deconstruction plan documents.
6.2 Project Purpose and Objectives
The principal purpose of the air monitoring program, as described in The document
entitled Environmental Community Air Monitoring Program for the 133-135 Greenwich
Street and 21-23 Thames Street Deconstruction Project, is to monitor air quality in the
vicinity of 133-135 Greenwich Street and 21-23 Thames Street during the deconstruction
of the building on that property. The plan consists of monitoring of dust in the vicinity of
the deconstruction site on both a real-time or continuous basis as well as a time-weighted
or integrated basis. Principal objectives of the program are as follows:
• Monitor dusts as PMio and PM2.5 on a real-time or continuous basis such that dust
associated with the building deconstruction are maintained below target and
trigger action levels.
• In the event that dust levels exceed target and trigger action levels, building
deconstruction management personnel will be immediately notified so that all
necessary corrective actions can be taken.
• Monitor PMio and PM2.5 on a time-weighted or 24-hour average basis to provide
assurances that levels of respirable particulate matter associated with the
deconstruction are below the 24 hour National Ambient Air Quality Standards
(NAAQS) of 150 ug/m3 and 65 ug m>. respectively.
• Collect particulate matter on a time-weighted or integrated basis such that
samples are available for monitoring of target compounds potentially associated
with World Trade Center dust (e.g., asbestos, lead).
• Compare measured concentrations of project target parameters to action levels
established on a compound-specific basis. In the event that measured
concentrations exceed any projectspecific action level for one or more of these
target compounds, appropriate corrective actions immediately will be taken. A
project timeline is provided as Figure 6-2.
• Collect waste stream samples for RCRA analyses in support of the Waste
Management Plan (WMP) to characterize, manage, containerize, and legally
transport and dispose of w’aste streams that will be generated as part of the 133-
135 Greenwich Street/21-23 Thames Street Deconstruction Project.
6.3 Project Action Levels
A two-tiered system will be in place during the entire term of the deconstruction project.
This system includes use of both Target Air Quality Levels and USEPA Site Specific
20
CITY_DEP_WORBY_CANNATA_SUBP_0001 01671
NYC-WTC_000427919
OCR can misread numbers and units. Confirm readings against the page image before using them.