Ambient Air Monitoring, Deconstruction Project

Machine-extracted title · confidence 49%

Ambient air monitoring program document for 130 Liberty Street deconstruction project, Sept 2005.

NYC-WTC_000427865–000427899
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Section 2 - Ambient Air Monitoring Program Revision No.: 0 130 Liberty Street Deconstruction Plan Date: September 7, 2005 Lower Manhattan Development Corporation

8.0 ACTION LEVELS AND MITIGATION MEASURES A two tiered system will be in place during the entire term of the deconstruction project. This system includes use of both Target Air Quality Levels and USEPA Site Specific Trigger Levels for each of the target parameters identified previously in Section 4. A summary listing of these Action Levels provided on a parameter specific basis is shown in Table 6.

Table 6. Target Air Quality Levels and USEPA Site Trigger Levels USEPA Site Specific Analyte Target Air Quality Levels^ Trigger Levels^ Metals Antimony 5 ug/m " 14 ug/m’ Barium 5 ug/m ’ 5 ug/m’ Beryllium_____ 0.02 ug/m’ 0.2 ug/m’ Cadmium 0.04 ug/m’ 2 ug/m’ Chromium’ 0.6 ug/m^ 0.6 ug/m’ Copper_______ 10 ug/m^ 100 ug/m’ Lead 1.5 ug/m^ 5 ug/m’ Manganese 0.5 ug/m^ 0.5 ug/m’ Mercury (Total) 0.3 ug/m^ 3 ug/m’ Nickel 0.2 ug/m’ 28 ug/m’ Zinc 16 ug/m’ 160 ug/m’ Particles and Dust Asbestos 0.0009 f/cc (PCME fibers) 70 S/mm’ (TEM AHERA sliuctuies) Particulate PMio (24 hour average) 150 ug/m _____ 150 ug/m’_____ Particulate PNE s (24 hour average) 40 ug/m^ _____ 65 ug/m’_____ Respirable Silica (crystalline) 10 ug/m 10 ug/m Organics (semi-volatiles) Dioxins/Furans (2,3,7,8 - TCDD equivalent) 0.00025 ii;-’/iii 0.025 ng/m^ PCB (total Aroclors ) 0.12 ug/m" 12 ug/m^ PAH (benzo-a-pyrene equivalent) 0.034 ug/m 3.4 ug/nr cumulative average after the first week of sampling, except for PM- s and PMio- 24-hoiu' value. ^USEPA site-specific trigger level for hexavalent chromium used.

8.1 Action Levels

The following actions will be taken if there is an exceedance of any Target Air Quality Level. If there is an exceedance of both the Target Air Quality Level and USEPA Site Specific Trigger Level, actions associated with the USEPA Site Specific Trigger Level will govern.

8-1

CITY_DEP_WORBY_CANNATA_SUBP_0001 01641

NYC-WTC_000427891

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000427891Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000421926

Amb monitoring plan for 130 Liberty Street deconstruction; LMDC involvement, Sept 2005.

Similar indexed content

NYC-WTC_000424704

CoC-style document for air monitoring at 130 Liberty Street deconstruction site.

Similar indexed content

NYC-WTC_000231976

Chain of custody documentation for the ambient air monitoring program during the deconstruction project at 130 Liberty Street dated September 7, 2005.