NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 35 pages

Ambient Air Monitoring, Deconstruction Project

Machine-extracted title · confidence 49%

Ambient air monitoring program document for 130 Liberty Street deconstruction project, Sept 2005.

NYC-WTC_000427865–000427899
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Section 2 - Ambient Air Monitoring Program Revision No.: 0 130 Liberty Street Deconstruction Plan Date: September 7, 2005 Lower Manhattan Development Corporation

TABLE OF CONTENTS

1.0 INTRODUCTION 1-1 1.1 Project Background and Evolution.......................................... 1-1 1.2 Project Purpose and Objectives............................................... 1-2 1.3 Overview of Air Quality Monitoring Programs and Features 1-2 2.0 SAMPLING SITES 2-1 2.1 Network Design..................................... 2-1 2.2 Siting Criteria and Network Operations 2-1 2.3 Locations of Monitoring Stations......... 2-4 3.0 SAMPLING PHASES 3-1 3.1 Background................................................ 3-1 3.2 Phase I - Preparation Phase...................... 3-1 3.3 Phase I - Asbestos and COPC Abatement 3-1 3.4 Phase II - Structural Deconstruction....... 3-2 4.0 TARGET PARAMETERS/COPCs 4-1

5.0 SAMPLING AND ANALYSES METHODOLOGY 5-1 5.1 ]PM10/PM2.5 Monitoring (“Real-Time’7Continuous)............... 5-2 5.1.1 Beta - Attenuation PMio and PM2.5 Monitors (All Sites) 5-2 5.1.2; USEPA Reference Method PMio and PM2.5 Monitors .... 5-3 5.2 Asbestos..................................................................................... 5-3 5.3 1Metals......................................................................................... 5-3 5.4 ]Mercury (Gas/Vapor)................................................................ 5-4 5.5 ]Mercury (Total Elemental)....................................................... 5-4 5.6 ]Respirable Dust and Crystalline Silica.................................... 5-4 5.7 ;Semivolatile Organics............................................................... 5-4 5.7.1 PCDDs/PCDFs and PAHs................................................ 5-4 5.7.2; PCBs.................................................................................. 5.8 Visible Emissions....................................................................... 6.0 SAMPLING FREQUENCY 6-1 6.1 Background........................................................... 6-1 6.2 Phase I - Preparation Phase................................. 6-1 6.3 Phase T - Asbestos and COPC Abatement Phase 6-4 6.4 Phase II - Structural Deconstruction................... 6-5 7.0 METEOROLOGICAL MONITORING 7-1

8.0 ACTION LEVELS AND MITIGATION MEASURES 8-1 8.1 Action Levels 8-1

CITY_DEP_WORBY_CANNATA_SUBP_0001 01616

NYC-WTC_000427866

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000427866Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000421926

Amb monitoring plan for 130 Liberty Street deconstruction; LMDC involvement, Sept 2005.

Similar indexed content

NYC-WTC_000424704

CoC-style document for air monitoring at 130 Liberty Street deconstruction site.

Similar indexed content

NYC-WTC_000231976

Chain of custody documentation for the ambient air monitoring program during the deconstruction project at 130 Liberty Street dated September 7, 2005.

Similar indexed content

Compare copies and versions →