NYC-WTC_000426348
Plan document outlining community air monitoring for Greenwich and Thames sites.
94 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗CoC document for Greenwich/Thames Street air monitoring plan dated Nov 9, 2005.
NYC-WTC_000427716–000427844OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Part V - Quality Assurance Project Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 - November 9, 2005
7.0 PROJECT/TASK DESCRIPTION
This section provides a general overview of the activities that will be performed and how and when they will be performed. Specific details for individual project activities will be discussed in later sections of the QAPP.
7.1 Project Overview
Based upon the companion document Pari II - Environmental Community Air Monitoring Program during the Abatement and Demolition of 133-135 Greenwich Street and 21-23 Thames Street, the primary objective of this investigation is to monitor air quality in the vicinity of 133-135 Greenwich Street and 21-23 Thames Street during the deconstruction of the building on that property. The plan consists of monitoring of dust in the vicinity of the deconstruction site on both a real-time or continuous basis as well as a time-weighted or integrated basis. These objectives will be satisfied by the sampling and analysis program outlined in Sections 7.1.1 and 7.1.2. Laboratories performing these analyses are summarized in Section 4.3.4 of the QAPP. There are multiple aspects and levels to the overall air monitoring program proposed for the deconstruction of 133-135 Greenwich Street and 21-23 Thames Street. The following is a brief summary of the three (3) components or levels of air monitoring proposed for the project:
• “Level 1”: The Contractors performing aspects of Abatement Phase deconstruction work (largely interior, non-structural efforts) will be responsible for collecting air samples on their personnel directly performing various work activities to determine airborne levels of contaminants potentially generated by the work at the source as required by OSHA. • “Level 2”: The next layer of sampling is for NYC Title 15, Chapter 1 compliance. NYC Title 15, Chapter 1-required sampling will entail sampling the ambient air inside the building during Abatement Phase work outside of work areas, at the personnel and waste load out decontamination stations and other locations. In addition, samples will be collected, as required, outside the building within ten (10) feet of the negative pressure ventilation exhaust. “Level 3”: Beyond that, there will be continuous monitoring of the exterior ambient air within the site boundaries and at specific elevated locations, as described in the Part II - Environmental Community Air Monitoring Plan During Abatement and Demolition of 133-135 Greenwich Street and 21-23 Thames Street. This QAPP further defines the technical approach and provides the anticipated schedule of activities for the “Level 3” air monitoring.
7.1.1 Sampling Tasks Sampling phases will consist of the following segments: Background, Abatement Phase and Demolition Phase. General descriptions of the work included in each phase are presented in Part II - Environmental Community Air Monitoring Program during theAbatement and Demolition of 133-135 Greenwich Street and 21-23 Thames Street. Sampling methods, sampling QC, sample handling and custody
25
CITY_DEP_WORBY_CANNATA_SUBP_0001 01056
NYC-WTC_000427740
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000426348
Plan document outlining community air monitoring for Greenwich and Thames sites.
94 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000424323
Plan title and approval sheet for environmental air monitoring, Greenwich/Thames.
94 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000423504
Plan document for environmental community air monitoring at Greenwich Street and 21-23 Thames Street, Nov 2005.
94 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444945
Plan and submittals for environmental community air monitoring at 133-135 Greenwich and 21-23 Thames.
91 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447434
Chain of custody plan for Greenwich Street/Thames Street site air monitoring.
91 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000440780
Plan document for environmental air monitoring at Greenwich Street and Thames Street sites, dated November 4, 2005.
91 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443742
Chain-of-custody form for Environmental Community Air Monitoring Program plans at Greenwich Street and Thames Street, dated November 4, 2005.
91 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000437816
Plan document for Environmental Community Air Monitoring at Greenwich and Thames sites, Nov 4, 2005.
91 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441316
Plan for Environmental Community Air Monitoring at Greenwich Street and Thames Street sites, Nov 2005.
91 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427582
CoC document for Greenwich/Thames Street air monitoring plan dated Nov 9, 2005.
89 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441133
Plan for Environmental Community Air Monitoring at Greenwich/Thames sites, Nov 2005.
91 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444496
Plan documents for environmental community air monitoring at Greenwich/Thames street sites, Nov 2005.
91 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000424323
Plan title and approval sheet for environmental air monitoring, Greenwich/Thames.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000423504
Plan document for environmental community air monitoring at Greenwich Street and 21-23 Thames Street, Nov 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426348
Plan document outlining community air monitoring for Greenwich and Thames sites.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000451808
Plan for Greenwich Street and Thames Street air monitoring project, Nov 9, 2005.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000420647
Plan for Community Air Monitoring at The Greenwich Street properties and related sites.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447434
Chain of custody plan for Greenwich Street/Thames Street site air monitoring.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Plan document outlining community air monitoring for Greenwich and Thames sites.
Similar indexed content
Plan title and approval sheet for environmental air monitoring, Greenwich/Thames.
Similar indexed content
Plan document for environmental community air monitoring at Greenwich Street and 21-23 Thames Street, Nov 2005.
Similar indexed content
Plan and submittals for environmental community air monitoring at 133-135 Greenwich and 21-23 Thames.
Similar indexed content
Chain of custody plan for Greenwich Street/Thames Street site air monitoring.
Similar indexed content