NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 117 pages

Quality Assurance Plan, Ambient Air Monitoring, Aug 2005

Machine-extracted title · confidence 42%

Draft QA Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, TRC scope, Aug 2005.

NYC-WTC_000427221–000427337
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 10 Quality Assurance Project Plan Revision No.: 0 130 Liberty Street - NY, NY Date: August 2005 Lower Manhattan Development Corporation Page 63 of 116

• Anderson RAAS PMio Sampler - A sampling system that meets the requirements of 40 CER Part 50 Appendix J for the sampling of PMio when operated in the PMio mode. The Anderson RAAS sampler design incorporates a flow-indicating device, a thermometer, a barometer, and a timing control device into the sample monitor.

Manometer - A water or oil manometer is used to calibrate the flows of the PMio samplers.

• Timing/Control Device - A timing device capable of starting and stopping the sampler to obtain an elapsed run time of 24 hr +1 hr. The accuracy of the timing device should be +15 minutes.

Flow Rate Transfer Standard - The flow rate transfer standard is a calibrated flow-metering device traceable to NIST standards that is used to deliver a series of discrete flow rates into the inlet of the PMio sampler so that the flow-indicating device on the sampler can be accurately calibrated.

10.2.9.2 PMio - Continuous Monitoring ofPMw via Met One E-BAM Samplers

The monitors selected to continuously measure PMio are beta-attenuation monitors manufactured by Met One Instruments, Inc. (Met One).

The E-BAM monitors will be equipped with particle size selective inlets. The design of the inlets is such that particles larger than the desired size range will be removed from the air flow at the prescribed air flow rate. The units will be equipped with an inlet head to separate PMio. Sampling flow rate is critical to maintain the proper particle size cut points of the inlets. Plow rates are maintained at 16.7 liters per minute in the E-BAM monitors using an integral flow meter, pressure sensor, and ambient temperature sensor on board each monitor.

10.2.10 PM2.S

PM2.5 will be determined by two separate methods. At each location, PAL - will be determined by a non-reference method utilizing Met One’s E-BAM Mass Monitor, which is a real-time monitor. Anderson RAAS samplers will be used to collect PM2.5 via the US EPA standard reference method (40 CER Part 50 Appendix L) at one location per day. An Anderson RAAS PM2.5 sampler will be collocated along side the real-time PM2.5 monitors as a QA check. The Anderson RAAS sampler will rotate on a monthly basis through all real-time PM2.5 monitor locations for the duration of the monitoring program.

10.2.10.1 PM2.5 - Reference Method via Anderson RAAS Samplers

Particulate samples whose aerodynamic diameter is <2.5 p will be collected using Anderson RAAS samples operating in the PAL - mode. All samples will be collected over an estimated twenty-four hour sampling interval at a prescribed flow rate of 16.67 liters/minute. This equates

L2005-346 Rev. 1

CITY_DEP_WORBY_CANNATA_SUBP_000093795

NYC-WTC_000427284

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000427284Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000428324

Draft QA project plan for Ambient Air Monitoring Program at 130 Liberty Street deconstruction (Aug 2005).

Similar indexed content

NYC-WTC_000421711

Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.

Similar indexed content

NYC-WTC_000449648

Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.

Similar indexed content

NYC-WTC_000426556

Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.

Similar indexed content

NYC-WTC_000421972

QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

Compare copies and versions →