NYC-WTC_000428324
Draft QA project plan for Ambient Air Monitoring Program at 130 Liberty Street deconstruction (Aug 2005).
75 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗Draft QA Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, TRC scope, Aug 2005.
NYC-WTC_000427221–000427337OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Ambient Air Monitoring Program Section No. 2 Quality Assurance Project Plan Revision No.: 0 130 Liberty Street - NY, NY Date: August 2005 Lower Manhattan Development Corporation Page 3 of 116
8.2.5 Sensitivity.... 49 8.2.6 Completeness 50 9.0 NON-DIRECT MEASUREMENTS (SECONDARY DATA) 51 10.0 FIELD MONITORING REQUIREMENTS............................ 52 10.1 Monitoring Process Design........................................................ 52 10.1.1 Meteorological Data Collection 52 10.2 Monitoring Methods......................... 52 10.2.1 Metals (TSP Filters)...................................................................... 52 10.2.2 Mercury (Gas)............................................................................... 53 10.2.3 Asbestos........................................................................................ 54 10.2.4 Respirable Crystalline Silica and Dust........................................ 55 10.2.5 Polychlorinated Dibenzodioxins (PCDDs) and Polychlorinated Dibenzofurans (PCDFs)............................................................... 56 10.2.6 Polychlorinated Biphenyls (PCBs).............................................. 58 10.2.7 Polycyclic Aromatic Hydrocarbons (PAHs)............................... 60 10.2.8 Mercury (Total)............................................................................. 61 10.2.9 PM 10................. 62 10.2.9.1 PMio- Reference Method via Anderson RAAS samplers 62 10.2.9.2 PMio- Continuous Monitoring of PMm via Met One E-BAM Samplers.... 63 10.2.10 PM2.5..................................................................................................... 63 10.2.10.1 PM2.5 - Reference Method via Anderson RAAS Samplers......... 63 10.2.10.2 Continuous Monitoring of PM2.5 via Met One E-BAM Samplers 65 10.3 Field Quality Control 65 10.3.1 Field Blanks/Trip Blanks.... 65 10.3.2 Cooler Temperature Blanks 65 10.3.3 Field Duplicates.................. 65 10.3.4 Field Spikes......................... 66 10.3.5 Breakthrough Checks ......... 66 10.3.6 Media Certification Checks 66 11.0 ANALYTICAL REQUIREMENTS 67 11.1 Analytical Methods......................... 67 11.1.1 Fixed Laboratory Analytical Methods and SOPs............ 67 11.1.2 Fixed Laboratory Analytical Method/SOP Modifications 67 11.1.2.1 PAH Extraction by EPA Method TO-13A and Analysis by SW-846 Method 8270C...................................................................................... 67 11.1.2.2 Dioxin Extraction by EPA Method TO-9A........................................ 67 11.1.2.3 Asbestos Analyses by TEM (AHERA)................................................ 68 11.1.2.4 Metals Analysis by SW-846 Method 6020A...................................... 69 11.2 Analytical Quality Control.............................. 69 11.2.1 Field Analytical QC................................ 69 11.2.2 Fixed Laboratory QC.............................. 70 11.2.2.1 Method Blanks/Preparation Blanks 70
L2005-346 Rev. 1
CITY_DEP_WORBY_CANNATA_SUBP_000093735
NYC-WTC_000427224
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000428324
Draft QA project plan for Ambient Air Monitoring Program at 130 Liberty Street deconstruction (Aug 2005).
75 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421711
Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.
74 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449648
Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.
74 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426556
Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.
72 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421972
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
72 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426821
QA plan reference for deconstruction ambient air monitoring, Sept 2005.
72 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421577
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
73 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000423219
Quality assurance plan and project details for ambient air monitoring near 130 Liberty Street, Sep 2005.
72 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000422676
QA plan for ambient air monitoring program for LMDC deconstruction at 130 Liberty Street.
72 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441561
Quality Assurance Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, Aug 2005.
74 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000451508
Quality assurance plan for ambient air monitoring at the Liberty Street deconstruction site, Sep 2005.
73 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444248
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.
74 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000428324
Draft QA project plan for Ambient Air Monitoring Program at 130 Liberty Street deconstruction (Aug 2005).
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426821
QA plan reference for deconstruction ambient air monitoring, Sept 2005.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426556
Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421972
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000422676
QA plan for ambient air monitoring program for LMDC deconstruction at 130 Liberty Street.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000423219
Quality assurance plan and project details for ambient air monitoring near 130 Liberty Street, Sep 2005.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Draft QA project plan for Ambient Air Monitoring Program at 130 Liberty Street deconstruction (Aug 2005).
Similar indexed content
Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.
Similar indexed content
Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.
Similar indexed content
Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.
Similar indexed content
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
Similar indexed content