Part V - Quality Assurance Project Plan
133-135 Greenwich Streel/21-23 Thames Street
Airtek Project 05-0701 - Rev 1 - January 27, 2006
PCDDs/PCDFs and PAHs Using a Tisch PUF High Volume Sampler
Table 13-lc summarizes the maintenance, testing, and inspection activities for the Tisch
PUF samplers.
Table 13-lc. Maintenance, Testing, and Inspection Requirements for Tisch PUF
Sampler Used for PCDDs/PCDFs, PAHs and PCBs
Equipment Frequency Method Acceptance Corrective Action
Criteria
Tisch PUF sampler Single point flow- Within =20% of the Service Tisch PUF
check at normal flow rate indicated sampler and perform
operating flow rate by the Tisch PUF a new multi-point
on weekly basis sampler calibration.
Power Cords Check for crimps or No obvious damage Replace as
cracks necessary
Cartridge Assembly Visually check on No obvious deposits Wipe clean daily
sample recovery
days
Gaskets At 3 month No leaks or Replace as
intervals, inspect all compression necessary
gaskets in the damage evident
sampler
Brushes Replace after 600- Stable flow rate Replace as
1000 hrs. of necessary
operations
Motor Replace as needed Consult Obtain the correct
manufacturer for model
correct model of
motor
Tubing and fittings Visually inspect on No crimps, cracks, Replace as necessary
sample recovery or obstructions: no
days crossthreading
91
CITY_DEP_WORBY_CANNATA_SUBP_000093279
NYC-WTC_000427047