NYC 9/11 Public Portal Document
RJ LeeGroM/?, Inc.
Exceedance Report
Date of Exceedance: March 14, 2005
Analyte: Airborne Asbestos
Location: (South) AFD Exhaust. Carlisle Street Sidewalk Bridge
Concentration: 88.2 s/niiii’
Trigger Level: 70 s/mm^
Summary of Event:
On Monday, March 14, 2005 sampling for airborne asbestos fibers was conducted at the (South) AFD
Exhaust on the Carlisle Street Sidewalk Bridge location. The sampling was initiated at 14:47PM on
March 14, 2005 and concluded at 22:47PM that same day (total collection time: 480 min.; sample
volume: 2400 liters). The sample was received at the RJ Lee Group laboratory (Monroeville, PA) on
Wednesday, March 16 and analyzed that evening using the AHERA TEM method. The results from the
analysis of the sample reported an asbestos fiber concentration of 88.2 s/mmC
The exceedance was reported by the laboratory via telephone to Mike Campbell on Wednesday night and
the results were e-mailed to all parties immediately. The DEP and EPA were notified, via telephone, of
the exceedance today, Thursday morning and a conference call to discuss this exceedance was held at
12:30PM this afternoon.
Corrective Action:
The AFD that had the exceedance was located on the Sth floor. During the 2“* shift on Monday, March
14, the shift of the exceedance, there was no work performed on this floor other than regular filter
maintenance of the AFD’s.
Upon receipt of the exceedance this AFD was immediately shut down, the intake was sealed with poly
and the slinky hose was taped shut and the spare AFD on the 8* floor was initialized. Since all abatement
and final cleaning activities had previously been completed on this floor and encapsulation of the floor
had taken place only hours before the report of the exceedance, there was no work stoppage.
Subsequent investigation of the exceedance included, a visual inspection of the AFD, a review of PAL’s
(the abatement contractor) site log along witli interviews of the site management team. Visual inspection
of the AFD showed taped repairs and a stretched, uncoiled, section of the “slinky” exhaust hose, also the
HEPA filter appeared to be seated properly. The PAL site log did not have any information regarding this
AFD, during the shift in question, however PAL representatives stated that during regular filter
maintenance a breech in the “slinky” hose was found and a repair, utilizing spray glue and duct tape was
performed. This repair reportedly required the AFD to be shut down for approximately 10 minutes.
No definite cause of the exceedance has been identified other than the reference to the slinky hose repair,
reported to have occurred during the sampling time frame of this exceedance.
Attachments:
Report summary -AHERA TEM Air Results for March 14, 2005
Submitted By: Mike Campbell Date: March 17, 2005
Draft
CITY_DEP_WORBY_CANNATA_SUBP_000091875
NYC-WTC_000426554
OCR can misread numbers and units. Confirm readings against the page image before using them.