Air Monitoring Requirements For 125 Cedar Street
Consultant - Air Monitoring Requirements
New York City Department of Environmental Protection Bureau of Environmental Compliance
Background
A follow-up visit to 125 Cedar Street revealed debris and significant dust accumulation present on horizontal surfaces throughout the interior of the building. The interior cleaning is to be accomplished by a licensed asbestos abatement contractor.
Purpose
The consultant shall provide personnel experienced and certified in asbestos air monitoring to be on-site, full-time, during work area preparation and cleaning phases of building interiors (12 stories and a penthouse-approximately 52,000 square feet in total). The air monitor(s) will observe the work, conduct air monitoring for analysis via Transmission Electron Microscopy (TEM) and monitor that the cleanup of the building interiors is being performed consistent with the project specifications and appropriate regulatory requirements. Work shall be performed 24 hours per day, seven (7) days per week
Air Monitoring/Construction Inspection Services
Air monitoring by an independent third party consultant shall be conducted during all cleanup activities. The air monitoring consultant shall provide individuals certified as project monitors and air sampling technicians to perform daily air sampling and inspections from the commencement of the project through to final air clearance sampling. The air monitoring consultant shall provide sufficient equipment and experienced personnel to monitor work area preparation and cleaning phases of the building interiors.
Qualifications
Project Monitoring The Project Monitors must posses valid NYS Asbestos Project Monitor certificates. Monitors must have served as a third party project monitor on at least 20 asbestos abatement projects. Project Monitor must have performed final clearance inspections on at least 30 asbestos abatement projects.
Technicians Air monitoring technicians must posses valid NYS Asbestos Project Sampling Technician (APST) certificates. Technicians must have performed air samplmg for at least 6 months.
Proof of qualifications must be presented upon request.
1 of 3
C ITY_D E P_WO RB Y_C AN N ATA_SU B P_000091789
NYC-WTC_000426498
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000429199
Air monitoring plan detailing 24/7 ops by a licenses asbestos abatement air-monitoring contractor.
6 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443585
DEP follow-up report recommending asbestos air monitoring during interior cleaning
6 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000433406
DEP/consultant air monitoring plan for asbestos cleaning and testing.
6 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000451028
Form describing air monitoring and construction inspection services for 125 Cedar Street project.
6 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434915
Background note for asbestos air monitoring at 125 Cedar Street, DEP project.
6 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000230793
Service agreement requiring certified air monitors to oversee cleaning operations at a building contaminated with debris.
6 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000452584
Proposal for on-site asbestos air monitoring during interior cleaning and debris removal.
6 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449867
Consultant air monitoring and construction inspection services for a high-rise building project.
6 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000362736
Air monitoring contract form for on-site asbestos monitoring at 125 Cedar Street.
6 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000428063
Independent air monitoring for asbestos cleanup at 125 Cedar Street interior debris and dust.
6 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000425475
Proposal/overview of air monitoring and construction inspection by a contractor for interior cleaning.
6 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000442191
DEP air monitoring/inspection memo for 125 Cedar Street with cleaning plan.
6 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000429199
Air monitoring plan detailing 24/7 ops by a licenses asbestos abatement air-monitoring contractor.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443585
DEP follow-up report recommending asbestos air monitoring during interior cleaning
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000230793
Service agreement requiring certified air monitors to oversee cleaning operations at a building contaminated with debris.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000433406
DEP/consultant air monitoring plan for asbestos cleaning and testing.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434915
Background note for asbestos air monitoring at 125 Cedar Street, DEP project.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000452584
Proposal for on-site asbestos air monitoring during interior cleaning and debris removal.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Air monitoring plan detailing 24/7 ops by a licenses asbestos abatement air-monitoring contractor.
Similar indexed content
NYC-WTC_000443585
DEP follow-up report recommending asbestos air monitoring during interior cleaning
Similar indexed content
NYC-WTC_000433406
DEP/consultant air monitoring plan for asbestos cleaning and testing.
Similar indexed content
NYC-WTC_000451028
Form describing air monitoring and construction inspection services for 125 Cedar Street project.
Similar indexed content
Background note for asbestos air monitoring at 125 Cedar Street, DEP project.
Similar indexed content