NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 38 pages

Community Air Monitoring Chain of Custody

Machine-extracted title · confidence 50%

CoC for environmental monitoring during 133-135 Greenwich and 21-23 Thames abatement.

NYC-WTC_000425860–000425897
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part II - Environmental Community Monitoring Plan 133-135 Greenwich & 21-23 Thames Streets Airtek Project 05-0701 - Rev 2 September 16, 2005

• Prepares chain-of-custody document. • Enters all required sample collection information into field log and database. • Maintains and calibrates sampling equipment.

2.2.3 IH Quality Coordinator / QA Officer

• Ensures that this procedure is kept up to date. • Assesses procedure implementation. • Receives and checks all samples and chain-of-custody documents prior to shipment to analytical laboratories. • Coordinates sample submission to and results received from analytical laboratories • Ensures aU records identified by this procedure are retained and archived as specified in Section 7.3 of this procedure. • Provides backup sample collection when required. • Maintains hard copies of sample collection data.

2.2.4 Data Manager

• Administers the sample tracking database. • Resolves collection data entry problems and assists the Sample Team Lead with collection creation or modifications. • Loads electronic result files into database and checks data for correctness and completeness. • Develops reports for review of sample tracking information. • Maintains electronic files of all sample data.

2.3 Policy

2.3.1 Basic Health and Safety Policy: All Airtek personnel must comply with applicable OSHA health and safety policies and other applicable federal, state, and local fire, health, safety, emergency preparedness, pollution prevention, and environmental protection regulations and policies. 2.3.2 Training Requirements and Documentation: All sampling personnel receive job-specific training by reviewing the appropriate procedures. At a minimum, this training consists of the following elements: • ACM/LBP Certification, as required • Personnel safety and use of personal protective equipment • Location of equipment and monitoring stations • Monitoring and sampling equipment operation • Sample handling and preparation • In addition, commercially available generic training is taken, when needed. • All training must be documented in the Berkeley Lab training database. All required documentation must be kept up to date. 2.3.3 Analysis Requirements:

22

CITY_DEP_WORBY_CANNATA_SUBP_000087305

NYC-WTC_000425881

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000425881Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000444890

Chain-of-custody/documentation for air monitoring around 133-135 Greenwich and 21-23 Thames

Similar indexed content

Compare copies and versions →