NYC 9/11 Public Portal Document
Section 2 - Ambient Air Monitoring Program Revision No.: 0
130 Liberty Street Deconstruction Plan Date: September 7, 2005
Lower Manhattan Development Corporation
5.0 SAMPLING AND ANALYSES METHODOLOGY
A summary of all sampling and analyses methods proposed for use during the deconstruction of
130 Liberty Street is provided in Table 2. All analytes will be measured at Locations 1-5
identified in Table 1 during the Background Phase. All analytes will be measured at each of the
stations identified in Section 2.0 of this plan during Phase I and Phase II. These phases as
defined in Section 3.0 of this plan include background monitoring (2 weeks prior to Phase I),
Phase I - Preparation Phase, Phase I - Asbestos and COPC Abatement, and Phase II - Structural
Deconstruction. As noted, all samples in Table 2 will be collected over 24-hour integrated time
periods with the exception of asbestos, silica, real-time PMm and PM2.5, and mercury vapor
employing the Lumex device. Asbestos and silica samples will be collected over 8 hour
averaging periods, while PMm and PVL . measurements will be collected on a continuous near
“real time” basis. Proper chain of custody procedures will be employed for all intregrated
samples collected. Details regarding the sampling and analyses methods planned for each type
of target parameter is provided in the following sections.
Table 2. Summary of Sampling and Analysis Methods
Sample Duration
Analyte Sampling Method Comments
Rate* Per day
Metals
Antimony, Barium, TSP High Volume Air 10001pm 24 hours ICP/MS EPA Method 10 3.5
Beryllium, Cadmium, Sampler 40 CFR Part
Chromium, Copper, 50 App B
Eead, Manganese,
Nickel, and Zinc
Mercury (Gas) Ohio Lumex RA 915-1- 201pm Instantaneously Elemental (gas) Mercury
Direct Read Analysis
Mercury (Total) lodated Carbon Trap 0.4 1pm 24 hours CVAFS
includes particulate EPA Method 324, modified
Particulate and Dust
Asbestos NIOSH 7402 mod. 6 1pm Minimum of 8 Analysis via AHERA Mod.
hours Methodology (TEM/SEM)
Particulate PMio Met One 16.7 1pm 24 hours Gravimetry RAAS Reference
EBAM/RAAS Sampler. EBAM continuous
Sampler monitor (10 min. avg.)
Particulate PM2.5 Met One 16.7 1pm 24 hours Gravimetry RAAS Reference
EBAM/RAAS Sampler. EBAM continuous
Sampler monitor (10 min. avg.)
Respirable Crystalline NIOSH 0600 2-2.1 1pm 8 hours SKC Aluminum Cyclone
Silica and Dust NIOSH 7500
Organics (semivolatile)
Dioxins/Furans EPA TO 9A 200-300 1pm 24 hours Quartz Fiber Filter and PUF
(PCDDs/PCDFs) Carhidge
Polychlorinated EPA TO-lOA .5 1pm 24 hours PUF Cartridge
biphenyls (PCB)
Polycyclic Aromatic EPATO-13 A 200-300 1pm 24 hours Quartz Tiber Eilter and
Hydrocarbons (PAH) PUP/XAD-2 “Sandwich”
5-1
CITY_DEP_WORBY_CANNATA_SUBP_000075884
NYC-WTC_000424717
OCR can misread numbers and units. Confirm readings against the page image before using them.