NYC 9/11 Public Portal Document
Part V - Quality Assurance Project Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701 - November 4, 2005
13.3.2 Analytical Laboratory Supplies/Consumables Critical supplies and sample
containers will be inspected in the following manner.
Critical Supplies and Inspection Requirements Responsible Individual
______ Consumables and Acceptance Criteria
Sample bottles, media Visually inspected upon Sample Custodian
receipt for cracks, breakage,
cleanliness. Must be
accompanied by certificate
of analysis.______________
Chemicals and reagents Visually inspected for Laboratory Analysts
proper labeling, expiration
dates, appropriate grade.
Record lot numbers of
reagents used for
calibration.
Supplies and consumables not meeting acceptance criteria will initiate the appropriate
corrective action. Corrective measures may include notification of vendor and subsequent
replacement of defective or inappropriate materials. All actions will be documented in the
project files.
Table 13-.4. Summary of Calibration Procedures for Fixed Laboratory Analyses
Parameter Frequency of Acceptance Criteria Corrective
Instrument Calibration Action
Metals/ICP/MS Initial Calibration: NA; monitored by IVC Perform
daily, every 24 necessary
hours or every time equipment
instrument us set maintenance
up______________ and check
Initial Calibration 90-110% of true value calibration
Verification: standards.
immediately after
initial calibration
Continuing 90-110% of true value
Calibration
Verification: after
every 10 samples
and at end of
analytical
sequence.
95
CITY_DEP_WORBY_CANNATA_SUBP_000072635
NYC-WTC_000424417
OCR can misread numbers and units. Confirm readings against the page image before using them.