NYC 9/11 Public Portal Document
Part V - Quality Assurance Project Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701 - November 4, 2005
PCDDs/PCDFs and PAHs Using a PS-1 High Volume Sampler
Table 13-lc summarizes the maintenance, testing, and inspection activities for the PS-
1 samplers.
Table 13-lc. Maintenance, Testing, and Inspection Requirements for PS-1 Sampler
Used for PCDDs/PCDFs and PAHs
Eau/pment Frequency Method Acceptance Corrective Action
Criteria
PS-1 sampler Single point flow Within =20% of the Service PS-
check at normal flow rate indicated 1 sampler and
operating flow rate by the PS-1 sampler perform a new
on weekly basis multi-point
calibration.
Power Cords Check for crimps or No obvious damage Replace as
cracks necessary
Cartridge Assembly Visually check on No obvious deposits Wipe clean daily
sample recovery
days
Gaskets At 3 month No leaks or Replace as
intervals, inspect all compression necessary
gaskets in the damage evident
sampler
Brushes Replace after 600- Stable flow rate Replace as
1000 hrs. of necessary
operations
Motor Replace as needed Consult Obtain the correct
manufacturer for model
correct model of
motor
Tubing and fittings Visually inspect on No crimps, cracks, Replace as necessary
sample recovery or obstructions: no
days crossthreading
88
CITY_DEP_WORBY_CANNATA_SUBP_000072628
NYC-WTC_000424410
OCR can misread numbers and units. Confirm readings against the page image before using them.