Page image not rendered yet. The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Part V - Quality Assurance Project Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701 - November 4, 2005
• Ensuring that field instruments are properly operated, calibrated, and maintained,
and that adequate documentation is kept for all instruments,
• Performing technical procedures and data recording in accordance with the
operating procedures,
• Collecting the required QC samples and thoroughly documenting QC sample
collection,
• Ensuring that field documentation and data are complete and accurate, and
• Communicating any nonconformance or potential data quality issues to the
AIRTEK Field Sampling Coordinator.
14
CITY_DEP_WORBY_CANNATA_SUBP_000072554
NYC-WTC_000424336
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000424336Source: NYC Law Department, mirrored locally