Environmental Community Air Monitoring Plan, Greenwich/Thames

Machine-extracted title · confidence 46%

Plan document for environmental community air monitoring at Greenwich Street and 21-23 Thames Street, Nov 2005.

NYC-WTC_000423504–000423632
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 - November 4, 2005

PMio and PM2.5 Using a TEOM 1400a Continuous Monitor

Maintenance, testing, and inspection requirements for the TEOM 1400a continuous monitors are as follows.

• Audit flow system periodically by performing leak checks and flow audits. • Clean inlets once a month. • Service pump annually or more often as needed. • Check the measurement system with the Zero and Span plates quarterly. • Clean dust off of detector-sensing region quarterly during calibration audit.

PMio and PM2.5 Using a Met One E-BAM Continuous Monitor

Maintenance, testing, and inspection requirements for the E-BAM continuous monitors are as follows.

• Audit flow system periodically by performing leak checks and flow audits. • Clean inlets once a month. • Service pump annually or more often as needed. • Check the measurement system with the Zero and Span plates quarterly. • Clean dust off of detector-sensing region quarterly during calibration audit.

13.1.2 Analytical Laboratory Equipment

This section describes the procedures and documentation activities that will be performed to ensure that all fixed laboratory instrumentation and equipment arc available and in good working order when needed. Table 13-2 details the fixed laboratory instrument maintenance, testing, and inspection requirements. Equipment maintenance logs must be kept and equipment must be checked prior to use.______________________________________________ Table 13-2. Instrument Maintenance, Testing and Inspection Requirements for Fixed Laboratory Analyses______________________________________ PsEsmeter/fnstEUfn&nt Maintenance, Testing and Inspection Activities Metals/ICP/MS Clean nebulizer, check pump tubing, replace disposables, check torch alignment, clean spray chamber. Inspect waste and rinse water container levels. Inspect roughing pump oil level and color. Remove and wipe down interface cones (replace as necessary). Inspect the injector and support adapter for cleanliness. Check the peristaltic pump tubing for wear and replace as necessary.

89

CITY_DEP_WORBY_CANNATA_SUBP_000058600

NYC-WTC_000423592

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000423592Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000424323

Plan title and approval sheet for environmental air monitoring, Greenwich/Thames.

Similar indexed content

NYC-WTC_000426348

Plan document outlining community air monitoring for Greenwich and Thames sites.

Similar indexed content

NYC-WTC_000427716

CoC document for Greenwich/Thames Street air monitoring plan dated Nov 9, 2005.

Similar indexed content

NYC-WTC_000447434

Chain of custody plan for Greenwich Street/Thames Street site air monitoring.

Similar indexed content

NYC-WTC_000444945

Plan and submittals for environmental community air monitoring at 133-135 Greenwich and 21-23 Thames.

Similar indexed content

Compare copies and versions →