NYC-WTC_000422676
QA plan for ambient air monitoring program for LMDC deconstruction at 130 Liberty Street.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗Quality assurance plan and project details for ambient air monitoring near 130 Liberty Street, Sep 2005.
NYC-WTC_000423219–000423350OCR status: ok · source: pdftotext
Z ■< Z ■<
o Ambient Air Monitoring Program Section No. 12 o co g Quality Assurance Project Plan Revision No.: 0
I o 130 Eiberty Street - NY, NY Date: September 7, 2005 “0 o Eower Manhattan Development Corporation Page 80 of 124 c o CT o o' ro "0 Ca3 o ro CD CD Table 12-1. Summary of Media, Preservation, and Holding Time Requirements 03
Estimated Preservation Maximum Holding O Analytical Parameter Analytical Method Media o Sample Volume Requirements Time o c Metals SW-846 Method 6020A 1440 m^ (1000 L/min 8” X 10” quartz fiber None 180 days to analysis 3 o for 24 hours) filter 3 Total Mercury EPA method 324, 0.576 m^ (0.4 L/min for 2 small iodated carbon None 28 days to analysis modified 24 hours) traps in series Asbestos (TEM) AIIERA 2.88 111" (6 E/min for 25mm diameter cassette None None minimum of 8 hours) with 0.45 pm pore size, mixed cellulose ester filter Asbestos (SEM) German VDI Method 2.88 m’ (6 E/min for 25mm diameter cassette None None 3492 minimum of 8 hours) with 0.1 pm pore size, polycarbonate filter Silica-Respirable NIOSH Method 7500 1.0 m® SKC aluminum cyclone; None None (2.0-2.1 E/min for 8 37 mm diameter hours) cassette with 5.0 pm pore size, polyvinyl chloride filter Particulate PMio 40 CFR Part 50, 24.05 111" 47 mm Teflon filters None None O Appendix J (16.7 E/min for 24 hours) Particulate PXF s 40 CFR Part 50, 24.05 111" 47 mm Teflon filters None None O Appendix E (16.7 E/min for 24 m hours) Dioxins/Furans EPA Method TO-9A 288 111" (200 E/min for Quartz fiber filter and Cool to 4°C 30 days to extraction; 45 o 24 hours) PUF carti idge days from extraction to J] □0 analysis PCBs SW-846 Method 8082 7.2 m" (5 L/min for 24 PUF cartridge Cool to 4°C; keep in 14 days to extraction; 40 hours) dark days from extraction to
s > analysis PAHs SW-846 Method 8270C 288 111" (200 E/min for Quartz fiber filter, Cool to 4°C; keep in 14 days to extraction; 40 24 hours) PUF/XAD-2 sandwich dark days from extraction to cartridge analysis c □0 o o o o on 00 ro CD 00
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000422676
QA plan for ambient air monitoring program for LMDC deconstruction at 130 Liberty Street.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426821
QA plan reference for deconstruction ambient air monitoring, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421972
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426556
Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421711
Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.
77 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421577
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
75 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427221
Draft QA Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, TRC scope, Aug 2005.
72 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447031
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
79 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443239
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.
79 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447891
QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.
79 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449908
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.
79 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448520
Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.
79 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000421711
Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426821
QA plan reference for deconstruction ambient air monitoring, Sept 2005.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000422676
QA plan for ambient air monitoring program for LMDC deconstruction at 130 Liberty Street.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426556
Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421972
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421577
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
QA plan for ambient air monitoring program for LMDC deconstruction at 130 Liberty Street.
Similar indexed content
QA plan reference for deconstruction ambient air monitoring, Sept 2005.
Similar indexed content
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
Similar indexed content
Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.
Similar indexed content
Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.
Similar indexed content