NYC-WTC_000426821
QA plan reference for deconstruction ambient air monitoring, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
NYC-WTC_000421972–000422103OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Ambient Air Monitoring Program Section No. 8 Quality Assurance Project Plan Revision No.: 0 130 Liberty Street - NY, NY Date: September 7, 2005 Lower Manhattan Development Corporation Page 57 of 124
required quantitation limits for this program, these factors were considered in ensuring the project Action Limits would be achieved.
Sensitivity will be maximized by following the EPA and NIOSH methods, utilizing experienced/trained laboratory personnel, and conducting laboratory audits.
8.2.6 Completeness
Completeness is a measure of the amount of valid data obtained from a measurement system compared to the amount that was expected to be obtained under normal conditions. “Normal conditions” are defined as the conditions expected if the sampling plan was implemented as planned.
Field Completeness Objectives
Field completeness is a measure of the amount of (1) valid measurements obtained from all the measurements taken in the project and (2) valid samples collected. With the exception of the real-time measurements, the field completeness objective will be a minimum of 80 percent. This allows for the potential loss of samples due to sampling problems or media breakage during transport. The completeness objective for the real-time measurements (e.g., PMio, PM2.5, gaseous mercury) will be a minimum of 90 percent.
Laboratory Completeness Objectives
Laboratory completeness is a measure of the amount of valid measurements obtained from all valid samples submitted to the laboratory. The laboratory completeness objective will be a minimum of 90 percent. This allows for the potential loss of samples impossible to analyze due to unforeseen interferences and rejected data following data validation.
CITY_DEP_WORBY_CANNATA_SUBP_000052424
NYC-WTC_000422029
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000426821
QA plan reference for deconstruction ambient air monitoring, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000423219
Quality assurance plan and project details for ambient air monitoring near 130 Liberty Street, Sep 2005.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000422676
QA plan for ambient air monitoring program for LMDC deconstruction at 130 Liberty Street.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426556
Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421711
Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.
77 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421577
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
75 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427221
Draft QA Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, TRC scope, Aug 2005.
72 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447031
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
79 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447891
QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.
79 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449908
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.
79 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443239
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.
79 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448520
Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.
79 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000426556
Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000423219
Quality assurance plan and project details for ambient air monitoring near 130 Liberty Street, Sep 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000422676
QA plan for ambient air monitoring program for LMDC deconstruction at 130 Liberty Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426821
QA plan reference for deconstruction ambient air monitoring, Sept 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421711
Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447031
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
QA plan reference for deconstruction ambient air monitoring, Sept 2005.
Similar indexed content
Quality assurance plan and project details for ambient air monitoring near 130 Liberty Street, Sep 2005.
Similar indexed content
QA plan for ambient air monitoring program for LMDC deconstruction at 130 Liberty Street.
Similar indexed content
Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.
Similar indexed content
Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.
Similar indexed content