NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 132 pages

Quality Assurance Plan for Ambient Air Monitoring, 130 Liberty Street

Machine-extracted title · confidence 60%

QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.

NYC-WTC_000421972–000422103
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 14 Quality Assurance Project Plan Revision No.: 0 130 Liberty Street - NY, NY Date: September 7, 2005 Lower Manhattan Development Corporation Page 103 of 124

14.0 DATA MANAGEMENT

14.1 Sample Collection Documentation

This section of the QAPP describes field documentation procedures that will be followed for this project. Records of field data will be made throughout the project to document critical data that might be needed at a later time, such as during preparation of the report, or for use by other investigators who were not present when the data were collected.

Field data will be recorded on the following logs, forms, and/or notebooks.

• Daily Personnel Log • Field Notebooks • Field Data Forms • Photographs • Equipment Calibration Logs • Health and Safety Logs

The TRC Field Sampling Coordinator has the responsibility to maintain the various logs, forms, and notebooks that document daily field activities as discussed below. Individual responsibilities will be delegated to other field staff as appropriate. Special emphasis will be placed on the completeness and accuracy of all information recorded in the field, and will contain statements that are legible, accurate, and inclusive documentation of project activities. Because the logbooks, field data forms, and chain-of-custody forms provide the basis for future reports, they must contain accurate facts and observations. The language used in recording all field data will be objective, factual, and free of personal interpretations or other terminology that may prove inappropriate.

In general, field forms will be used to record most of the daily field information including calibrations, start and stop times of pumps, sample volumes, equipment inspections, etc. These forms will be filed in the on-site trailer/office. The following sections describe how data collected in the field will be documented, tracked, and controlled.

14.1.1 Daily Personnel Log

A log may be maintained in the field trailer to record the identities of all personnel who are on­ site for the duration of the project. A sign will be posted at the entrance to the site indicating that all visitors and contractors must sign-in at the field trailer. The log will record the following information.

• Names of field personnel • Names of subcontractor personnel

CITY_DEP_WORBY_CANNATA_SUBP_000052470

NYC-WTC_000422075

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000422075Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000426821

QA plan reference for deconstruction ambient air monitoring, Sept 2005.

Similar indexed content

NYC-WTC_000423219

Quality assurance plan and project details for ambient air monitoring near 130 Liberty Street, Sep 2005.

Similar indexed content

NYC-WTC_000422676

QA plan for ambient air monitoring program for LMDC deconstruction at 130 Liberty Street.

Similar indexed content

NYC-WTC_000426556

Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.

Similar indexed content

NYC-WTC_000421711

Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.

Similar indexed content

Compare copies and versions →