NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 132 pages

Quality Assurance Plan for Ambient Air Monitoring, 130 Liberty Street

Machine-extracted title · confidence 60%

QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.

NYC-WTC_000421972–000422103
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

Z ■< Z ■<

o o io Ambient Air Monitoring Program Quality Assurance Project Plan 130 Liberty Street - NY, NY Section No. 13 Revision No.: 0 Date: September 7, 2005 co

I Lower Manhattan Development Corporation Page 99 of 124 ■D o c o CT o o' KJ ■D KJ o O Table 13-4, Summary of Calibration Procedures for Fixed Laboratory Analyses 3. 03 Parameter/Instrunient Frequency of Calibration Acceptance Criteria Corrective Action o Continuing Calibration Verification RRFs must be within + 20% of initial o o (BCS 3): beginning and end of each calibration mean RRF for unlabclcd c 3 12 hour shift or batch, whichever is standards and + 30% for labeled CD smaller standards; verify GC column performance and isomer specificity. S/N ratio must be > 10:1 for labeled standards and >5:1 for unlabeled standards. PAHs/GC/MS Initial Calibration: prior to sample % RSD of RRFs must be < 30 for all Perform necessary equipment analysis or whenever indicated by standards; S/N ratio must be > 10:1 maintenance and check calibration continuing calibration for labeled standards and >2.5:1 for standards. unlabeled standards.______________ Initial Calibration Verification: 70-130% of hue value Immediately after the initial calibration curve__________________ Continuing Calibration: prior to RRFs must be within + 30% of initial analysis at beginning of each 12-hour calibration mean RRFs; S/N ratio shift must be > 10:1 for labeled standards and >2.5:1 for unlabeled standards. O PCBs/GC/ECD Initial Calibration: prior to sample %RSD of CFs must be <20 Perform necessary equipment analysis or whenever indicated by maintenance and check calibration o continuing calibration standards. m Initial Calibration Verification: 85-115% of true value immediately after the initial calibration curve__________________ o Continuing Calibration: beginning of CFs must be within 15% of initial J] □0 each day, every 10 samples, and at calibration mean CFs end of analytical sequence

s >

c □0 o o o o tn r\o CJ) CJ)

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000422071Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000426821

QA plan reference for deconstruction ambient air monitoring, Sept 2005.

Similar indexed content

NYC-WTC_000423219

Quality assurance plan and project details for ambient air monitoring near 130 Liberty Street, Sep 2005.

Similar indexed content

NYC-WTC_000422676

QA plan for ambient air monitoring program for LMDC deconstruction at 130 Liberty Street.

Similar indexed content

NYC-WTC_000426556

Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.

Similar indexed content

NYC-WTC_000421711

Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.

Similar indexed content

Compare copies and versions →