NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 134 pages

Environmental Community Air Monitoring Program plan, Greenwich/Thames

Machine-extracted title · confidence 52%

Plan for environmental air monitoring around The Greenwich Street and Thames Street sites.

NYC-WTC_000420513–000420646
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Strcct/21-23 Thames Street Airtek Project 05-0701 - November 9, 2005

Table 13-3c. Calibration Requirements for PS-1 Samplers PS-1 Sampler Initial Calibration: NA NA Multipoint calibration performed before first use, quarterly thereafter, after relocation to new site, or after repairs which may affect calibration. Single point flow Within =20% of the Service PS-1 check at normal flow rate indicated sampler and perform operating flow rate by PS-1 sampler a new multi-point on weekly basis calibration

Orifice Transfer Annual Calibration NA NA Standard by manufacturer and when visual inspection reveals new dents in the device. Calibration records maintained and tracked by Quality Assurance Officer and Field Sampling Coordinator.

PMio and PM2.5 Using a Reference Sampler

Calibration procedures are as follows:

• Transfer Standard Calibration Frequency - The flow rate transfer standard should be sent back to the manufacturer annually for recalibration. Also, if any visual inspection reveals new defects in the device, then it should be sent back to the manufacturer for recalibration. The calibration records will be maintained and tracked by the Quality Assurance Officer and Field Sampling Coordinator. • Calibration of the Samplers - A multipoint flow-rate calibration consisting of at least three (3) points must be performed before first use and quarterly thereafter. Additionally, the sampler should be calibrated after any repairs that might affect calibration; after relocation of the sampler to a different site; or if the results of a field QC flow check exceed ±10% of the samplers indicated flow rate.

PMio and PM2.5 Using a Met One E-BAM Continuous Monitor Calibration verification is performed using two calibration plates that represent a Zero and Span factory set calibration points. Check that the serial number on calibration plates

96

CONFIDENTIAL, SUBJECT TO PROTECTIVE ORDER NO. 1, JAN. 2013 CITY_DEP_WORBY_CANNATA_SUBP_000010843

NYC-WTC_000420608

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000420608Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000451808

Plan for Greenwich Street and Thames Street air monitoring project, Nov 9, 2005.

Similar indexed content

NYC-WTC_000427582

CoC document for Greenwich/Thames Street air monitoring plan dated Nov 9, 2005.

Similar indexed content

NYC-WTC_000424189

Plan title and approval sheet for environmental air monitoring, Greenwich/Thames.

Similar indexed content

NYC-WTC_000423370

Plan document for environmental community air monitoring at Greenwich and Thames Street sites, Nov 2005.

Similar indexed content

Compare copies and versions →