NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 134 pages

Environmental Community Air Monitoring Program plan, Greenwich/Thames

Machine-extracted title · confidence 52%

Plan for environmental air monitoring around The Greenwich Street and Thames Street sites.

NYC-WTC_000420513–000420646
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Strcct/21-23 Thames Street Airtek Project 05-0701 - November 9, 2005

Demolition Phase - Structural Deconstruction During Demolition Phase of the deconstruction project, air monitoring will take place at three (3) stations each day. Samples will be collected and analyzed for semivolatile organics to include PCDDs/PCDFs, PAHs and PCBs. Sampling for semivolatile organics will be conducted at a once per week frequency employing the entire station network. One day per week on a rotating basis (week #1 Monday, week #2 Tuesday, etc.) samples will be collected at every station in the network. The schedule will be repeated until project completion. The semivolatile organic samples collected employing this weekly sampling frequency will not be processed for analyses; rather they will be placed in archival storage at the laboratory. A single set of samples will be selected from each weekly sampling event to undergo analyses for PCDDs/PCDFs, PAHs and PCBs. This sample set will be selected after consideration of the PMiodata corresponding to the sites and days where organic samples were collected. The station with the highest 24-hour average PMio concentration (pg/ms) recorded with a collocated organic sample each week will be selected for analyses. Monitoring will cease at project completion pursuant to completion of deconstruction plan activities.

7.1.2 Analytical Tasks

These objectives include monitoring of dust potentially related to the deconstruction for the presence of contaminants related to the WTC terrorist attacks that might pose long­ term health risks to local residents, as well as identifying levels of Contaminants of Potential Concern (COPCs) associated with the materials at 133-135 Greenwich Street and 21-23 Thames Street. In this manner the deconstruction project can proceed while providing an ample margin of safety for human health and the environment in the vicinity of the project site. The following target parameters were selected for inclusion in the monitoring program based upon criteria established by USEPA and the Contaminants of Potential Concern (COPC Committee):

• PMio-Respirable Particulate • PM2.5-Respirable Particulate • Asbestos • Crystalline Silica • PCDDs/PCDFs • PAHs • PCBs • Metals (antimony, barium, beryllium, cadmium, chromium, copper, lead, mercury [gaseous and total] manganese, nickel and zinc).

The analyses of asbestos, crystalline silica, PCDDs/PCDFs, PAHs, PCBs, metals, particulate bound mercury, PMio 24-hour reference samples, and PM2.5 24-hour reference samples will be performed by fixed laboratories. Field analyses during this investigation will include PMio- Respirable Particulate, PM2.5-Respirable Particulate, and gaseous

31

CONFIDENTIAL, SUBJECT TO PROTECTIVE ORDER NO. 1, JAN. 2013 CITY_DEP_WORBY_CANNATA_SUBP_000010778

NYC-WTC_000420543

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000420543Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000451808

Plan for Greenwich Street and Thames Street air monitoring project, Nov 9, 2005.

Similar indexed content

NYC-WTC_000427582

CoC document for Greenwich/Thames Street air monitoring plan dated Nov 9, 2005.

Similar indexed content

NYC-WTC_000424189

Plan title and approval sheet for environmental air monitoring, Greenwich/Thames.

Similar indexed content

NYC-WTC_000423370

Plan document for environmental community air monitoring at Greenwich and Thames Street sites, Nov 2005.

Similar indexed content

Compare copies and versions →