Environmental Community Air Monitoring Program plan, Greenwich/Thames

Machine-extracted title · confidence 52%

Plan for environmental air monitoring around The Greenwich Street and Thames Street sites.

NYC-WTC_000420513–000420646
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Strcct/21-23 Thames Street Airtek Project 05-0701 - November 9, 2005

responsible for an internal verification of the transcribed infonnation. Daily external verification of the field analysis records by the AIRTEK Field Sampling Coordinator, or designee, will ensure that:

• Logbooks and standardized forms have been filled out completely and that the information recorded accurately reflects the activities that were performed. • Records are legible and in accordance with good record keeping procedures, i.e., entries are signed and dated, data are not obliterated, changes are initialed, dated, and explained. • Calibration procedures were conducted in accordance with the protocols described in the QAPP, and that any deviations were documented and approved by the appropriate personnel.

16.1.3 Fixed Laboratory Data

16.1.3.] Internal Reviews

Prior to the release of any data from the laboratory, the data will be verified and approved by laboratory personnel. This review will consist of a tiered review by the person performing the work, a qualified peer, and by supervisory personnel. Each laboratory used in the program has a procedure in place for documenting all levels of data review. Prior to being released as final, laboratory data will proceed through a tiered review process. Data verification starts with the analyst or technician who performs a 100 percent review of the data to ensure the work was done correctly the first time. It is the responsibility of the analyst or technician to ensure that the verification of data in his or her area is complete. The data reduction and initial verification process must ensure that:

• Sample preparation and analysis information is correct and complete, • Results are correct and complete, • The appropriate methods have been followed and are identified in the project records, • Proper documentation procedures have been followed, • All nonconformances have been documented, • Project-specific requirements have been met.

Following the completion of the initial verification by the analyst or technician, a systematic check of the data will be performed by an experienced peer. Laboratory Section Leader, or designee. This check will be performed to ensure that initial review has been completed correctly and thoroughly. Included in this review will be an assessment of the acceptability of the data with respect to:

• Adherence of the procedure used to the referenced methods and specific instructions.

120

CONFIDENTIAL, SUBJECT TO PROTECTIVE ORDER NO. 1, JAN. 2013 CITY_DEP_WORBY_CANNATA_SUBP_000010867

NYC-WTC_000420632

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000420632Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000451808

Plan for Greenwich Street and Thames Street air monitoring project, Nov 9, 2005.

Similar indexed content

NYC-WTC_000427582

CoC document for Greenwich/Thames Street air monitoring plan dated Nov 9, 2005.

Similar indexed content

NYC-WTC_000424189

Plan title and approval sheet for environmental air monitoring, Greenwich/Thames.

Similar indexed content

NYC-WTC_000423370

Plan document for environmental community air monitoring at Greenwich and Thames Street sites, Nov 2005.

Similar indexed content

Compare copies and versions →