Daily work force report, World Trade Center, Jan 2002

Machine-extracted title · confidence 41%

Night final daily workforce report listing crews and CAT/HITACHI equipment at World Trade Center.

NYC-WTC_000419286
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151.45einRoad, Wfiilaslone, n.Y. iisst-(718)787-8000 DATE: 1-9-02 NIGHT FINAL

daily work force report 1 Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor ___________ Equipment CLASSIFICATION QUANT. _______ Description______ MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER________ 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER________ 1 FOREMEN___________ 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 BUCKET 1 LABORERS 14 CAT 375 GRAPPLER 1 IRON WORKERS ■ HITACHI 7S0 GRAPPLER 1 LOCAL 14 5 ■ HITACHI 550 BUCKET 1 LOCAL 15 9 ■ HITACHI 1200 GRAPPLER 1 CARPENTER ■ 185 CFM COMPRESSOR CARPENTER FOREMAN ■ 235 HAMMER HOE RAM 1 TEAMSTERS 1 ■ mechanics TRUCK 1 MECHANICS 2 TOOLTRUCK HOUSE WRECKERS 7 TOOLVAN roll off DUMP TRAILERS LOW BED TRAILER DELIVERIES: HIGH DECK TRAILERS WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 3 LIGHT TOWERS 15 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK ‘LIGHT TOWERS USED FOR 2 HOURS DURING DAY FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 4 FLAT TRUCK PUMP 2 rainmaker/genie lift 1

oc Dascfiption of Work: ,COMPLETED WORK___________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND~5OUTH OF MAIN CHILLER PLANT MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA________________________________________________ MAN WATERING STATIONS FOR DUST CONTROL____________________________ ______________________ LOADS OUT:__________________________________________________________________________________ EUKES OUT:

GRACE CONTRACTING CORP| Approved By: BY: Title: I For: superintendent

DAILY WORK FORCE REPORTOlOSN xIs 01.307846

CITY_21MC100_004162008

NYC-WTC_000419286

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000419286Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →