NYC-WTC_000290079
Day final daily workforce and equipment at World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗Preliminary daily workforce and equipment for World Trade Center, Jan 8, 2002.
NYC-WTC_000419280OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151 -45 8th Road. Whitestone, N.Y. 113S7- (718) 7a7-9OOfl DATE: 1-8-02 DAY PRELIMINARY
DAILY WORK FORCE REPORT
Job Name & Location . World Trade Center Contract No. Weather Conditions
Labor Equipment CLASSIFICATION QUANT, ir Description MANNED STANDBY IDLE! SUPERINTENDENT 1 CAT 966 LOADER_________ 1 PROJECT ENGINEER 2 GAT446 BACKHOE l—L— OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT365GRAPPLER 1 SAFETY OFFICER CAT 375 BUCKET 1 LABORERS 19 CAT 375 GRAPPLER 1 IRON WORKERS HITACHI 750 GRAPPLER 1 LOCAL 14 6 HITACHI 550 BUCKET 1 LOCAL 15 a HITACH11200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK HOUSE WRECKERS 4 TOOL VAN 1 ROLL OFF DUMP TRAILERS LOW BED TRAILER DELIVERIES: BLACK BEAR HIGH DECK TRAILERS WELDING TRUCK 1 FUEL TRUCK____________ J PICKUP TRUCKS 5 LIGHT TOWERS_________ 13 SITE MULE______________ 3 DUMP TRUCKS__________ 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 ■ CARGO BOXES 4 ■ FLAT TRUCK___________ 1 ■ PUMP £ ■ RAINMAKER/GENIE LIFT 1
Description of Work: ANTICIPATED WORK__________________________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA_______________________________________________ MAN WATERING STATIONS FOR DUST CONTROL LOADS OUT;_________________________________________________________________________________ EUKES OUT:
GRACE CONTRACTING CORP| Approved By: Title; For; SUPERINTENDENT Z'Z
DAILY WORK FORCE REPORT0108D.xls 01.306995
Hl CITY_21MC100_004161521
NYC-WTC_000419280
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000290079
Day final daily workforce and equipment at World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000235123
Final daily report from Grace Contracting Corp. detailing workforce and equipment at the World Trade Center site on January 8, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342283
Nightly workforce report detailing crew and machinery for World Trade Center job.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263606
Daily workforce and equipment roster for World Trade Center site, Jan 2002.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356536
Nightfinal daily workforce and equipment counts for World Trade site, Jan 2002.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342291
Nightly daily workforce report for World Trade Center construction.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263615
Daily workforce and equipment roster for World Trade Center site, Jan 2002.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429379
Day shift daily workforce and equipment list for World Trade site, Jan 2002.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263614
Daily workforce and equipment roster for World Trade Center site, Jan 2002.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302500
Night preliminary daily workforce report for World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305346
Daily workforce and equipment listing for World Trade Center project site, including labor and machine counts.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429385
Day shift workforce and equipment entries for World Trade site, Jan 2002.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000290079
Day final daily workforce and equipment at World Trade Center site.
Similar indexed content
NYC-WTC_000235123
Final daily report from Grace Contracting Corp. detailing workforce and equipment at the World Trade Center site on January 8, 2002.
Similar indexed content
NYC-WTC_000342283
Nightly workforce report detailing crew and machinery for World Trade Center job.
Similar indexed content
NYC-WTC_000263606
Daily workforce and equipment roster for World Trade Center site, Jan 2002.
Similar indexed content
NYC-WTC_000356536
Nightfinal daily workforce and equipment counts for World Trade site, Jan 2002.
Similar indexed content