NYC-WTC_000269356
Requisition-like sheet listing hourly and daily rates for trucks and equipment at the Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.864
machine-extracted · confidence unavailable · Check page ↗Interviews and responses on invoicing; discusses daily vs monthly rates and related findings.
NYC-WTC_000419220OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
I interviews corroborate the paperwork submitted by Angel Aerial for its daily rates, TA believes that DDC should consider the daily versus monthly rate and, in view of the project duration, the daily rate should be approximately 30% less. This adjustment should also be retroactively applied to the billings submitted through January 11, 2002. TA also reviewed Angel Aerial’s response to the City of New York, Department of Investigation, Subpoena dated July 2, 2002. Angel Aerial provided the information ;i requested in the subpoena in a timely manner. The materials provided helped TA substantiate some of Angel Aerial’s claims and corroborated several of our findings.
I TA has identified Requisitions for Payment to Tully Construction, Inc., from October 20, 2001, through January 6, 2002, that billed for labor but did not include equipment
I charges. Labor charges were included in TA’s previous analysis. To date, TA found no invoices for equipment. As a result of our conversation with Jim Miller on July 30, 2002, TA learned that Tully was billed for equipment through another affiliate named
I Dust Utilities Management Enterprises, Inc. TA will examine this issue more closely now that we have the information.
Summary of Analysis
In the Report and Addendum issued previously, TA has identified several issues I regarding Angel Aerial Corporation’s billing through January 20, 2002. In the previously issued Report and Addenda, TA also explained its methodology for determining the appropriate hourly rate to each piece of equipment invoiced by Angel Aerial Corporation on the project. In Addendum No. 2, TA uses the same methodologies in performing our analysis of the items invoiced through Requisitions 10 through 20. Where applicable, I additional equipment utilized by the Contractor on the project has been identified and the cost charged for that equipment has been analyzed. The following represents a breakdown of the specific areas examined and the potential cost savings attributed to I those areas.
Water Truck Overcharges I The potential Water Truck overcharges for Requisitions 10 through 20 are $442,569.13 and a spreadsheet for these findings is provided in Attachment 2. The potential Water I Truck overcharges reflected in Addendum No. 2 are based on the methodology utilized in TA’s “Angel Aerial Equipment and Accessory Costing” report dated June 17, 2002.
I At the request of the City of New York, Department of Investigation, TA conducted interviews with various film production studios to determine the scope of services reflected by the $850.00 per day Water Truck rental rate. Many of the entities TA I attempted to reach have telephone numbers that are no longer in service. TA contacted a total of four (4) film production companies; Kate and Leopold, Few Good Years, Jail House and Hudson County, Argyle Road Films, LLC. All four (4) entities confirmed that I the $850.00 per day rate includes the Water Truck rental fee without labor. While the rates charged prior to 9/11/02 have been suggested as an alternative to the “Blue Book”
I 3 07.003095
I CITY_21MC100_001129252 NYC-WTC_000419220
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000269356
Requisition-like sheet listing hourly and daily rates for trucks and equipment at the Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.864
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000268772
Requisitions and equipment listing for on-site water-related operations.
1 shared non-person entities · 1 shared topics · similarity 0.863
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269357
Continuation of requisition page detailing equipment items and costs for on-site use.
1 shared non-person entities · 1 shared topics · similarity 0.861
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419218
Addendum to prior TA report evaluating dust suppression equipment and invoicing.
2 shared non-person entities · 1 shared topics · similarity 0.859
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000337577
Proposal outlining costs for dust protection after WTC disaster demolition.
1 shared non-person entities · 1 shared topics · similarity 0.881
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000195490
Invoice from the Office of Management and Budget regarding services provided by the Office of the Chief Medical Examiner in 2002.
2 shared non-person entities · similarity 0.870
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000136391
Records folder index from Mayor's office covering World Trade Center administrative materials.
Similar document embedding; no shared entity or topic indexed. · similarity 0.864
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154143
Contract document between the City of New York DEP and a contractor for supply and services at World Trade Center residential sites.
1 shared non-person entities · 1 shared topics · similarity 0.863
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000137580
Cover sheet for a file folder containing World Trade Center environmental protection records from the Office of the Mayor.
1 shared non-person entities · similarity 0.860
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000143653
Invoice detailing fees for the World Trade Center hotline project including distribution of materials and service costs.
1 shared non-person entities · 1 shared topics · similarity 0.858
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000354406
MayoPj presentation-related invoice excerpt; City of Philadelphia reference.
Similar document embedding; no shared entity or topic indexed. · similarity 0.858
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000136670
Archival folder label from the Office of the Mayor for World Trade Center records, identified as Folder 0140.
1 shared non-person entities · similarity 0.857
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000337577
Proposal outlining costs for dust protection after WTC disaster demolition.
Similar indexed content
Invoice from the Office of Management and Budget regarding services provided by the Office of the Chief Medical Examiner in 2002.
Similar indexed content
NYC-WTC_000136391
Records folder index from Mayor's office covering World Trade Center administrative materials.
Similar indexed content
NYC-WTC_000269356
Requisition-like sheet listing hourly and daily rates for trucks and equipment at the Trade Center site.
Similar indexed content
NYC-WTC_000154143
Contract document between the City of New York DEP and a contractor for supply and services at World Trade Center residential sites.
Similar indexed content