Daily work force report, World Trade Center

Machine-extracted title · confidence 28%

Final daily workforce report for World Trade Center construction, Grace Contracting, Dec 7, 2001 (Day).

NYC-WTC_000419102
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE j CONTRACTING CORP. ISMS 6th Roap, Whitestone. N.Y. 11357-(718) 767-9000 DATE: DECEMBER 7, 2001 (DAY FINAL)

DAILY WORK FORCE REPORT

Ijob Name & Location: World Trade Center Contract Np. IWeather Conditions

Labor Equipment CLASSIFICATION QUANT. Description iMANNED STANDBY iDLe SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT 446 BACKHOE i 1 OFFICE ENGINEER CAT 973 LOADER ! 1 FOREMEN i CAT 365 GRAPPLER I 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS,' 19 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 4 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 1 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM. 1 TEAMSTERS 10 MECHANICS TRUCK ' 2 MECHANICS 2 TOOL TRUCK 1 HOUSE WRECKERS 6 TOOL VAN 1 ROLL OFF DUMP TRAILERS 7 LOW BED TRAILER DELIVERIES; AWISCO HIGH DECK TRAILERS ; 2 i AUSTER RUBBER WELDING TRUCK j ~ 1 FUEL TRUCK i 1 PICKUP TRUCKS ‘ 8 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK 1 PUMP 2 ROLLER 1 RAINMAKER/GENIE LIFT 1 ~ll -- \ Description 3f Work: LOADS OUT: 60 YUKE LOADS 30 LOAD OUT STEEL AND DEBRIS MANNED tapping AND TRIMMING STATIONS MANNED WATER STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA CONTINUE iREMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY CONTINUE‘.BURNING OF THE SW CORNER COLUMN BEAMS ELEVATIONS: ALL MACHINES LEVEL B-5 253

GRAI.pE CONTACTING .CORP ) Approved By: Title: i' BY; For; I SUPERINTENDENT 01.301923 DAILY WORK FORCE REPORT 1207D.xls

CITY_2IMCl0 0_0 010 6 9 8 7 5 NYC-WTC_000419102

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000419102Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000199927

Daily report from Grace Contracting Corp. listing workforce classifications and heavy equipment usage at the World Trade Center site.

Similar indexed content

Compare copies and versions →